Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 32.3 m = 106.0 ft
Main Spans: 1 at 31.1 m = 102.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Christiana [13512]: Lancaster County [071], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 8
Christiana Borough
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Excellent [9]
Loading
Design: HL93 [A]
Operating: 99.9 metric ton = 109.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 65.3 metric ton = 71.8 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Other structural work: including hydraulic replacements. [38]
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 1983 (2019) and Trucks: 9%
Future ADT: 2143 (In 2039
)