Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 31.2 m = 102.4 ft
Main Spans: 3 at 10.7 m = 35.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.4 m = 37.4 ft (2 Lanes) and Out-To-Out: 12.3 m = 40.4 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Montgomery County [107], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
04.21 W SR 75
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 59.9 metric ton = 65.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 49 metric ton = 53.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1480 (2013) and Trucks: 4%
Future ADT: 1750 (In 2033
)