Bridge Type
Main Span(s): Prestressed concrete continuous [6] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 47.5 m = 155.8 ft
Main Spans: 3 at 17 m = 55.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.4 m = 40.7 ft (2 Lanes) and Out-To-Out: 13.3 m = 43.6 ft for a 8.4 m = 27.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Montgomery County [107], Indiana [18]
Owned by State Highway Agency [01], DOT District: 1
02.15 S SR 32
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Inventory: 20.9 metric ton = 23.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 5810 (2006) and Trucks: 5%
Future ADT: 8047 (In 2032
)