HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


ARAMAYO WAY over SACRAMENTO RIVER (Route: 0)
Num: 08C0002x
Open: no restriction [A]
Built: 1977, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 305.4 m = 1002.0 ft
Main Spans: 6 at 53.3 m = 174.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tehama County [103], California [06]
Owned by County Highway Agency [02], DOT District: 2
1.0 MI WEST OF SH 99
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 52.5 metric ton = 57.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 30.5 metric ton = 33.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 3.5 km = 2.2 mi
Traffic
ADT: 3300 (2006) and Trucks: 8%
Future ADT: 5273 (In 2040 )
TEHAMA VINA ROAD over SACRAMENTO RIV OVERFLOW (Route: 0)
Num: 08C0278x
Open: no restriction [A]
Built: 1921, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 60.4 m = 198.2 ft
Main Spans: 12 at 4.9 m = 16.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tehama County [103], California [06]
Owned by County Highway Agency [02], DOT District: 2
0.1 MI WEST OF RIVER AVE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 26.9 metric ton = 29.6 tons ()
Inventory: 16.2 metric ton = 17.8 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 1000 (2006) and Trucks: 2%
Future ADT: 2110 (In 2040 )
ARAMAYO WAY over SACRAMENTO RIV OVERFLOW (Route: 0)
Num: 08C0075x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 28.5 m = 93.5 ft
Main Spans: 4 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tehama County [103], California [06]
Owned by County Highway Agency [02], DOT District: 2
0.8 MI W OF SH 99
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.3 metric ton = 66.3 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 4.5 km = 2.8 mi
Traffic
ADT: 2000 (2006) and Trucks: 8%
Future ADT: 3186 (In 2042 )
ARAMAYO WAY over SACRAMENTO RIV OVERFLOW (Route: 0)
Num: 08C0080x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28.5 m = 93.5 ft
Main Spans: 4 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 12.5 m = 41.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tehama County [103], California [06]
Owned by County Highway Agency [02], DOT District: 2
0.6 MI W OF SH 99
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.6 metric ton = 65.6 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 4.5 km = 2.8 mi
Traffic
ADT: 3300 (2006) and Trucks: 8%
Future ADT: 5273 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider