Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 76.5 m = 251.0 ft
Main Spans: 3 at 26.5 m = 86.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Montgomery County [107], Indiana [18]
Owned by County Highway Agency [02], DOT District: 1
00.10 N of Wabash Ave
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.3 metric ton = 82.8 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 80 (2014) and Trucks: 5%
Future ADT: 110 (In 2034
)