Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Gravel [8]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.8 m = 15.7 ft (1 Lanes) and Out-To-Out: 5.3 m = 17.4 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Adams County [001], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 6
2.0 MI NE LAPRAIRIE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 32.4 metric ton = 35.6 tons ()
Inventory: 17.5 metric ton = 19.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 75 (2018) and Trucks: 0%
Future ADT: 26 (In 2032
)