Railroad Avenue over Greeley Loveland Canal (Route: 0)
Num:LOV150RAILRD AVx
Open: no restriction [A]
Built: 1917, Reconstructed: 1970
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.8 m = 42.0 ft
Main Spans: 1 at 11.2 m = 36.7 ft
Approach Spans: 0
Skew: 38
Width, Roadway: 10 m = 32.8 ft (2 Lanes) and Out-To-Out: 12.5 m = 41.0 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 41
0.1 Mi N of East First St
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 36.3 metric ton = 39.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: March 2021 [0321] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1542 (2012) and Trucks: 9%
Future ADT: 2420 (In 2032 )
West First Street over Greeley Loveland Canal (Route: 8260)
Num:LOV180W.1ST STx
Open: no restriction [A]
Built: 1984, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.8 m = 61.7 ft
Main Spans: 1 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 54
Width, Roadway: 14.6 m = 47.9 ft (3 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 41
180 W First Street
Condition
Deck: Serious [3]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63 metric ton = 69.3 tons (Load Factor(LF) [1])
Inventory: 41 metric ton = 45.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: March 2020 [0320] and Frequency: 12
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 13845 (2012) and Trucks: 12%
Future ADT: 21737 (In 2032 )
US 287 SBND over GREELEY-LOVELAND CANAL (Route: 287)
Num:C-16-BHx
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.6 m = 44.6 ft
Main Spans: 1 at 12.6 m = 41.3 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.4 m = 57.1 ft (4 Lanes) and Out-To-Out: 22.3 m = 73.2 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by State Highway Agency [01], DOT District: 41
CLEVELAND AVE at 1st ST
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Inventory: 21.8 metric ton = 24.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12000 (2018) and Trucks: 4%
Future ADT: 13320 (In 2038 )
US 287 NBND over GREELEY-LOVELAND CANAL (Route: 287)
Num:C-16-BIx
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.8 m = 45.3 ft
Main Spans: 1 at 12 m = 39.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.7 m = 44.9 ft (2 Lanes) and Out-To-Out: 18.6 m = 61.0 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by State Highway Agency [01], DOT District: 41
LINCOLN AVE at 1st ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 69.9 metric ton = 76.9 tons (Load Factor(LF) [1])
Inventory: 41.9 metric ton = 46.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12000 (2018) and Trucks: 5%
Future ADT: 13920 (In 2038 )
Railroad Avenue over Big Thompson River (Route: 8281)
Num:LOV450SRAILRDAVx
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.9 m = 107.9 ft
Main Spans: 1 at 31.3 m = 102.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 16.5 m = 54.1 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 41
450 S Railroad Avenue
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 67.3 metric ton = 74.0 tons (Load Factor(LF) [1])
Inventory: 40.4 metric ton = 44.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2317 (2012) and Trucks: 4%
Future ADT: 3637 (In 2032 )
Washington Avenue over Greeley Loveland Canal (Route: 8283)
Num:LOV150WASHTN AVx
Open: no restriction [A]
Built: 1922, Reconstructed: 1970
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.1 m = 33.1 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.7 m = 31.8 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 41
100 Ft N of 1st St
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 32.7 metric ton = 36.0 tons ()
Inventory: 24.5 metric ton = 27.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3490 (2012) and Trucks: 9%
Future ADT: 5480 (In 2032 )
Monroe Avenue over Greeley Loveland Canal (Route: 0)
Num:LOV150MONROE AVx
Open: no restriction [A]
Built: 1922, Reconstructed: 1970
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 14
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Loveland [46465]: Larimer County [069], Colorado [08]
Owned by City or Municipal Highway Agency [04], DOT District: 41
150 Ft N of First Street
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 36.3 metric ton = 39.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: March 2021 [0321] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 971 (2012) and Trucks: 4%
Future ADT: 1524 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.