Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 167.6 m = 549.9 ft
Main Spans: 6 at 42.7 m = 140.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 11.7 m = 38.4 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Tazewell County [179], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
1mi N JCT I-155 /122
Condition
Deck: Poor [4]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.4 metric ton = 71.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34.3 metric ton = 37.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7100 (2019) and Trucks: 19%
Future ADT: 6773 (In 2032
)