Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 22.7 m = 74.5 ft
Main Spans: 3 at 8.7 m = 28.5 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Celina [12868]: Mercer County [107], Ohio [39]
Owned by State Highway Agency [01], DOT District: 7
.83MI.S.OF JCT. SR 29
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 42.1 metric ton = 46.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 1.8 km = 1.1 mi
Traffic
ADT: 9767 (2015) and Trucks: 9%
Future ADT: 13557 (In 2038
)