Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Concrete [1] Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 1143 m = 3750.2 ft
Main Spans: 34 at 90.2 m = 295.9 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 15 m = 49.2 ft (4 Lanes) and Out-To-Out: 15.9 m = 52.2 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 18.9 m = 62.0 ft
Location
Unknown [04590]: Tazewell County [179], Illinois [17]
Owned by State Highway Agency [01], DOT District: 4
CEDAR ST AT PEORIA
Condition
Deck: Satisfactory [6]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 40.5 metric ton = 44.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 11300 (2018) and Trucks: 6%
Future ADT: 11682 (In 2032
)