Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 53 m = 173.9 ft
Main Spans: 2 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 7.8 m = 25.6 ft (2 Lanes) and Out-To-Out: 8.7 m = 28.5 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Burnside [10288]: Clearfield County [033], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 2
90FT W OF SR 219 INTER
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 73.5 metric ton = 80.9 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 46.3 metric ton = 50.9 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 134 (2019) and Trucks: 0%
Future ADT: 149 (In 2039
)