HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


T535 McAuley Falls over SOUTH FORK PINE CREEK (Route: 0)
Num:48264x
Open: no restriction [A]
Built: 2013, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 23.2 m = 76.1 ft
Main Spans: 1 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 4.6 m = 15.1 ft (1 Lanes) and Out-To-Out: 5.6 m = 18.4 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boggs [07416]: Armstrong County [005], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 10
1.3 Mi. NW of SR28
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 68 metric ton = 74.8 tons (Unknown [F])
Inventory: 40.8 metric ton = 44.9 tons (Unknown [F])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 50 (2013) and Trucks: 0%
Future ADT: 60 (In 2033 )
SR1034 over NORTH FORK PINE CREEK (Route: 0)
Num:39589x
Open: no restriction [A]
Built: 1938, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Channel beam [22]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.1 m = 33.1 ft
Main Spans: 1 at 9.4 m = 30.8 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 9.3 m = 30.5 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boggs [07416]: Armstrong County [005], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 10
MOSGRAVE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 97.1 metric ton = 106.8 tons (Load Factor(LF) [1])
Inventory: 58.1 metric ton = 63.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 164 (2021) and Trucks: 11%
Future ADT: 373 (In 2032 )
T576 SLOAN HILL RD over PINE CREEK (Route: 0)
Num:3398x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 31.1 m = 102.0 ft
Main Spans: 2 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rayburn [63560]: Armstrong County [005], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 10
25 FEET EAST OF SR 1033
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 84.4 metric ton = 92.8 tons (Load Factor(LF) [1])
Inventory: 44.5 metric ton = 49.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 377 (2009) and Trucks: 9%
Future ADT: 414 (In 2029 )
T-576 SLOAN ROAD over BUFFALO & PITT RR (Route: 0)
Num:3399x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 38.1 m = 125.0 ft
Main Spans: 1 at 36.6 m = 120.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rayburn [63560]: Armstrong County [005], Pennsylvania [42]
Owned by County Highway Agency [02], DOT District: 10
2 MILES WEST OF SR28/66
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 200 (2006) and Trucks: 9%
Future ADT: 280 (In 2026 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.