Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 1 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.4 m = 24.3 ft (2 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Marion [47456]: Centre County [027], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 2
2 MI. S. HOWARD
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.3 metric ton = 71.8 tons (Allowable Stress(AS) [2])
Inventory: 40.8 metric ton = 44.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2561 (2019) and Trucks: 3%
Future ADT: 3409 (In 2040
)