Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 58.5 m = 191.9 ft
Main Spans: 2 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7 m = 23.0 ft (2 Lanes) and Out-To-Out: 7.5 m = 24.6 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Clover [14408]: Jefferson County [065], Pennsylvania [42]
Owned by State Highway Agency [01], DOT District: 10
BAXTER
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 236 (2021) and Trucks: 7%
Future ADT: 252 (In 2032
)