HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


ROUTE 59 over ROUTE 15 (Route: 59)
Num:744x
Open: no restriction [A]
Built: 1936, Reconstructed: 1995
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.6 m = 84.0 ft
Main Spans: 1 at 24.6 m = 80.7 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairfield [26620]: Fairfield County [001], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 3
AT EXIT 46
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11000 (2013) and Trucks: 4%
Future ADT: 16345 (In 2033 )
ROUTE 59 over MILL RIVER (Route: 59)
Num:1029x
Open: no restriction [A]
Built: 1939, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13 m = 42.7 ft
Main Spans: 1 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 52
Width, Roadway: 14.2 m = 46.6 ft (2 Lanes) and Out-To-Out: 15.3 m = 50.2 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Easton [23890]: Fairfield County [001], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 3
625 FT N OF ROUTE 15
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.4 metric ton = 66.4 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 9700 (2016) and Trucks: 6%
Future ADT: 14413 (In 2036 )
ROUTE 15 over MILL RIVER (Route: 15)
Num:743x
Posted for other load-capacity restriction [R]
Built: 2010, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 22.2 m = 72.8 ft (4 Lanes) and Out-To-Out: 28.7 m = 94.2 ft for a 22.3 m = 73.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairfield [26620]: Fairfield County [001], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 3
0.5 MI S OF ROUTE 58
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 99 metric ton = 108.9 tons (Load Factor(LF) [1])
Inventory: 59.3 metric ton = 65.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 74100 (2015) and Trucks: 1%
Future ADT: 110105 (In 2035 )
CONGRESS STREET #2 over MILL RIVER (Route: 0)
Num:4196x
Open: no restriction [A]
Built: 1935, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.7 m = 35.1 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Fairfield [26620]: Fairfield County [001], Connecticut [09]
Owned by Town or Township Highway Agency [03], DOT District: 3
0.5 MI W OF ROUTE 59
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 68.9 metric ton = 75.8 tons (Load Factor(LF) [1])
Inventory: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6320 (2020) and Trucks: 4%
Future ADT: 9391 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider