Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 1 at 9.7 m = 31.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 3 m = 9.8 ft (1 Lanes) and Out-To-Out: 4 m = 13.1 ft for a 3 m = 9.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Highlands [34550]: Orange County [071], New York [36]
Owned by State Park: Forest: or Reservation Agency [11], DOT District: 83
1.8 MI SW JCT RTS 6+9W
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 79.8 metric ton = 87.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 0 (2020) and Trucks: 10%
Future ADT: 0 (In 0
)