HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 11


SSR 437 over WINTHROP COVE (Route: 437)
Num:2887x
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 2 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 0 m = 0.0 ft (4 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
475 FT E OF ROUTE 32
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 27.5 metric ton = 30.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2600 (2017) and Trucks: 4%
Future ADT: 3863 (In 2037 )
SSR 437 over NE CENTRAL RR & DRIVEWAY (Route: 437)
Num:6030x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 79.2 m = 259.9 ft
Main Spans: 3 at 44.5 m = 146.0 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 13.6 m = 44.6 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.3 MI E OF ROUTE 32
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.3 metric ton = 94.9 tons (Load Factor(LF) [1])
Inventory: 51.8 metric ton = 57.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 500 (2017) and Trucks: 6%
Future ADT: 743 (In 2037 )
SR 641 over ROUTE 32 (Route: 641)
Num:2875x
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 96 m = 315.0 ft
Main Spans: 2 at 47.2 m = 154.9 ft
Approach Spans: 0
Skew: 50
Width, Roadway: 13.4 m = 44.0 ft (2 Lanes) and Out-To-Out: 17.5 m = 57.4 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.3 MI S OF I-95
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Inventory: 27.8 metric ton = 30.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8500 (2015) and Trucks: 6%
Future ADT: 12630 (In 2035 )
SSR 437 over NEW ENGLAND CENTRAL RR (Route: 437)
Num:5521x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.1 m = 65.9 ft
Main Spans: 1 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14 m = 45.9 ft (2 Lanes) and Out-To-Out: 18.1 m = 59.4 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
1000 FT WEST OF THAMES RV
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.2 metric ton = 91.5 tons (Load Factor(LF) [1])
Inventory: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 500 (2017) and Trucks: 6%
Future ADT: 743 (In 2037 )
SSR 437 over EIGHTH STREET (Route: 437)
Num:5876x
Open: no restriction [A]
Built: 1915, Reconstructed: 1990
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 8.8 m = 28.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.9 m = 29.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by Other State Agencies [21], DOT District: 2
0.4 MI E OF ROUTE 32
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54 metric ton = 59.4 tons (Load Factor(LF) [1])
Inventory: 31.7 metric ton = 34.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 250 (2015) and Trucks: 20%
Future ADT: 371 (In 2035 )
INTERSTATE 95 SOUT over THAMES RV LOC RDS & RR (Route: 95)
Num: 02514Ax
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Steel continuous [4] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 1941 m = 6368.4 ft
Main Spans: 11 at 164.6 m = 540.1 ft
Approach Spans: 19
Skew: 99
Width, Roadway: 20.7 m = 67.9 ft (4 Lanes) and Out-To-Out: 21.9 m = 71.9 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 5.82 m = 19.1 ft and Navigational Clearance: 41.1 m = 134.8 ft
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
O/THAMES RV LOC ROAD & RR
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49.1 metric ton = 54.0 tons (Load Factor(LF) [1])
Inventory: 29.4 metric ton = 32.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 52050 (2017) and Trucks: 14%
Future ADT: 77341 (In 2037 )
I-95 NB TR 819 over SR 641 (Route: 95)
Num:2864x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 36.3 m = 119.1 ft
Main Spans: 1 at 34.4 m = 112.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 10.2 m = 33.5 ft (1 Lanes) and Out-To-Out: 12.7 m = 41.7 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI N OF ROUTE 32
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 57.1 metric ton = 62.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6530 (2019) and Trucks: 9%
Future ADT: 9703 (In 2039 )
ROUTE 32 SB over WILLIAMS STREET NO 1 (Route: 32)
Num:2857x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 42 m = 137.8 ft
Main Spans: 1 at 40.3 m = 132.2 ft
Approach Spans: 0
Skew: 51
Width, Roadway: 15.2 m = 49.9 ft (3 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI S OF I-95
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 67.2 metric ton = 73.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7700 (2017) and Trucks: 4%
Future ADT: 11441 (In 2037 )
ROUTE 32 NB over WILLIAMS STREET NO 1 (Route: 32)
Num:2856x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 46.9 m = 153.9 ft
Main Spans: 1 at 45.1 m = 148.0 ft
Approach Spans: 0
Skew: 56
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.8 m = 42.0 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI S OF I-95
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 74.8 metric ton = 82.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7700 (2017) and Trucks: 4%
Future ADT: 11441 (In 2037 )
I-95 TR 817 over SR 635 & STATE PIER RD (Route: 95)
Num: 02514Bx
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 110.3 m = 361.9 ft
Main Spans: 3 at 38.4 m = 126.0 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 15.1 m = 49.5 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
EXIT 84 I-95 SOUTH
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 98.8 metric ton = 108.7 tons (Load Factor(LF) [1])
Inventory: 59.2 metric ton = 65.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17180 (2018) and Trucks: 9%
Future ADT: 25528 (In 2038 )
INTERSTATE-95 NB over WILLIAMS ST (SR 635) (Route: 95)
Num:3820x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.5 m = 123.0 ft
Main Spans: 1 at 36.1 m = 118.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 22.4 m = 73.5 ft (4 Lanes) and Out-To-Out: 23.6 m = 77.4 ft for a 22.3 m = 73.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [52350]: New London County [011], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 2
0.1 MI W OF THAMES RIVER
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 92.5 metric ton = 101.8 tons (Load Factor(LF) [1])
Inventory: 55.5 metric ton = 61.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 38100 (2017) and Trucks: 14%
Future ADT: 56613 (In 2037 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider