Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Gravel [8]
Bridge Dimensions
Length: 18.9 m = 62.0 ft
Main Spans: 1 at 18 m = 59.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Henry County [073], Illinois [17]
Owned by Town or Township Highway Agency [03], DOT District: 2
2.0 M NW ANNAWAN
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 44.4 metric ton = 48.8 tons (Unknown [D])
Inventory: 32.4 metric ton = 35.6 tons (Unknown [D])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: January 2020 [0120] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 75 (2010) and Trucks: 13%
Future ADT: 150 (In 2040
)