Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 1021.7 m = 3352.2 ft
Main Spans: 18 at 91.4 m = 299.9 ft
Approach Spans: 1
Skew: 15
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 21.7 m = 71.2 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 14.3 m = 46.9 ft
Location
Unknown [03185]: Cook County [031], Illinois [17]
Owned by State Highway Agency [01], DOT District: 1
0.30 M S DUPAGE CO
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 52.2 metric ton = 57.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 31.4 metric ton = 34.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.8 km = 1.1 mi
Traffic
ADT: 23300 (2018) and Trucks: 8%
Future ADT: 20085 (In 2032
)