Bridge Type
Main Span(s): Aluminum: Wrought Iron or Cast Iron [9] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 2 at 3.7 m = 12.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (3 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 15.9 m = 52.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Andover [01080]: Tolland County [013], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
1.24 MI WEST COLUMBIA TL
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 90.4 metric ton = 99.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 69.7 metric ton = 76.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 17100 (2015) and Trucks: 0%
Future ADT: 25409 (In 2035
)