INTERSTATE-91 SB over CSORR: SR 598WB & TR803 (Route: 91)
Num: 01469Bx
Open: no restriction [A]
Built: 1964, Reconstructed: 2011
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 548.8 m = 1800.6 ft
Main Spans: 6 at 45.7 m = 149.9 ft
Approach Spans: 27
Skew: 99
Width, Roadway: 12.8 m = 42.0 ft (3 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
DUTCH POINT VIADUCT
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Inventory: 29.4 metric ton = 32.3 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 48200 (2015) and Trucks: 14%
Future ADT: 71620 (In 2035 )
SR 598 EASTBOUND over NO NOTABLE FEATURE (Route: 598)
Num: 01469Cx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 110.3 m = 361.9 ft
Main Spans: 9 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
ACCESS TO I-91S FROM 598E
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.8 metric ton = 47.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 30.1 metric ton = 33.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17400 (2015) and Trucks: 6%
Future ADT: 25855 (In 2035 )
INTERSTATE-91 NB over PARK RIVER & CSO RR (Route: 91)
Num: 01469Ax
Open: no restriction [A]
Built: 1964, Reconstructed: 2018
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 411.5 m = 1350.1 ft
Main Spans: 2 at 42.7 m = 140.1 ft
Approach Spans: 27
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 6.55 m = 21.5 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
AT EXIT 29A
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.7 metric ton = 60.2 tons (Load Factor(LF) [1])
Inventory: 32.8 metric ton = 36.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 48200 (2015) and Trucks: 9%
Future ADT: 71620 (In 2035 )
SR 598 EB TR 803 over SR 598 WB &CONN SOUTHERN (Route: 598)
Num:1863x
Open: no restriction [A]
Built: 1964, Reconstructed: 2005
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Culvert [19]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 56.1 m = 184.1 ft
Main Spans: 3 at 20.7 m = 67.9 ft
Approach Spans: 1
Skew: 99
Width, Roadway: 11.5 m = 37.7 ft (1 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 11.5 m = 37.7 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
RAMP FROM SR598 TO I91 NB
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 39.5 metric ton = 43.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 30.5 metric ton = 33.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8700 (2015) and Trucks: 8%
Future ADT: 12927 (In 2035 )
SR 598 WESTBOUND over CT SOUTHERN RAILROAD (Route: 598)
Num: 01469Dx
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 253 m = 830.1 ft
Main Spans: 21 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.8 m = 42.0 ft (2 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
EXIT 29A OFF I-91 NB
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.1 metric ton = 60.6 tons (Load Factor(LF) [1])
Inventory: 33.1 metric ton = 36.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 17400 (2015) and Trucks: 8%
Future ADT: 25855 (In 2035 )
I-91 SB & I-91 TR over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3621x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 19.8 m = 65.0 ft
Main Spans: 1 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 72
Width, Roadway: 12.8 m = 42.0 ft (3 Lanes) and Out-To-Out: 90.4 m = 296.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
I-91 SB EXIT 29A
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78 metric ton = 85.8 tons (Allowable Stress(AS) [2])
Inventory: 43.5 metric ton = 47.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 37700 (2015) and Trucks: 9%
Future ADT: 56018 (In 2035 )
COMMERCE STREET over SR 598 (Route: 0)
Num:1855x
Open: no restriction [A]
Built: 1964, Reconstructed: 2005
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 67.1 m = 220.2 ft
Main Spans: 2 at 41.8 m = 137.1 ft
Approach Spans: 1
Skew: 25
Width, Roadway: 10.6 m = 34.8 ft (2 Lanes) and Out-To-Out: 16.4 m = 53.8 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.1 MI W OF JCT I-91
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 63 metric ton = 69.3 tons (Load Factor(LF) [1])
Inventory: 37.8 metric ton = 41.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 6300 (2014) and Trucks: 3%
Future ADT: 9361 (In 2034 )
I-91 SB & TR 835 over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3622x
Open: no restriction [A]
Built: 1958, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 45.7 m = 149.9 ft
Main Spans: 18 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 80
Width, Roadway: 7.9 m = 25.9 ft (5 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
AT EXIT 29A
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.7 metric ton = 48.1 tons (Load Factor(LF) [1])
Inventory: 30.7 metric ton = 33.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Superior to present desirable criteria [9]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 37700 (2015) and Trucks: 14%
Future ADT: 56018 (In 2035 )
INTERSTATE-91 over CONNECTICUT SOUTHERN RR (Route: 91)
Num:3277x
Open: no restriction [A]
Built: 1958, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 32.3 m = 106.0 ft (7 Lanes) and Out-To-Out: 34.3 m = 112.5 ft for a 32.3 m = 106.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
.3 MILE NORTH OF EXIT 29A
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 98 metric ton = 107.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 75400 (2015) and Trucks: 14%
Future ADT: 112037 (In 2035 )
I-91 & NB C-D RDWY over I-91 NORTHBOUND RAMP 188 (Route: 91)
Num:6555x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 14.3 m = 46.9 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 73.8 m = 242.1 ft (9 Lanes) and Out-To-Out: 94 m = 308.4 ft for a 73.8 m = 242.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
400' SOUTH OF FOUNDERS BR
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.7 metric ton = 103.1 tons (Load Factor(LF) [1])
Inventory: 56.1 metric ton = 61.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 92900 (2015) and Trucks: 14%
Future ADT: 138040 (In 2035 )
I-91 SOUTHBOUND AN over I-84 ACCESS RAMP 331 (Route: 91)
Num:6556x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 23.8 m = 78.1 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 22.6 m = 74.2 ft (4 Lanes) and Out-To-Out: 57 m = 187.0 ft for a 22.6 m = 74.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
400' SOUTH OF FOUNDERS BR
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.6 metric ton = 92.0 tons (Load Factor(LF) [1])
Inventory: 50.2 metric ton = 55.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 68750 (2015) and Trucks: 14%
Future ADT: 102156 (In 2035 )
COLUMBUS BOULEVARD over SR 598 (WHITEHEAD HWY) (Route: 0)
Num:1629x
Open: no restriction [A]
Built: 2005, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29.6 m = 97.1 ft
Main Spans: 1 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 21.9 m = 71.9 ft (6 Lanes) and Out-To-Out: 27.5 m = 90.2 ft for a 21.9 m = 71.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
0.5 MI S OF I-84 OVERPASS
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 79.6 metric ton = 87.6 tons (Load Factor(LF) [1])
Inventory: 48 metric ton = 52.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 22300 (2018) and Trucks: 5%
Future ADT: 33136 (In 2038 )
ROUTE 2 over I-91 & CONN RV CT SO. RR (Route: 2)
Num: 00371Ax
Open: no restriction [A]
Built: 1958, Reconstructed: 1999
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 358.1 m = 1174.9 ft
Main Spans: 6 at 51.2 m = 168.0 ft
Approach Spans: 5
Skew: 6
Width, Roadway: 26.2 m = 86.0 ft (7 Lanes) and Out-To-Out: 34.1 m = 111.9 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 5.89 m = 19.3 ft and Navigational Clearance: 14 m = 45.9 ft
Location
Hartford [37070]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
JCT ROUTE 2 & I-91
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.7 metric ton = 65.7 tons (Load Factor(LF) [1])
Inventory: 35.8 metric ton = 39.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 28300 (2018) and Trucks: 8%
Future ADT: 42051 (In 2038 )
ROUTE 2 over EAST RIVER DRIVE (Route: 2)
Num:372x
Open: no restriction [A]
Built: 1958, Reconstructed: 1997
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 29.3 m = 96.1 ft
Main Spans: 1 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 25.9 m = 85.0 ft (7 Lanes) and Out-To-Out: 31.6 m = 103.7 ft for a 26.5 m = 86.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
East Hartford [22630]: Hartford County [003], Connecticut [09]
Owned by State Highway Agency [01], DOT District: 1
1 MI EAST OF HARTFORD TL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 73.4 metric ton = 80.7 tons (Load Factor(LF) [1])
Inventory: 44 metric ton = 48.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 28900 (2015) and Trucks: 6%
Future ADT: 42943 (In 2035 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.