Nearby Bridges in NBI 2021: 4


US 20 PARK AVE over WATER CONNECTICUT RIVER (Route: 20)
Num:S240030UJDOTNBIx
Open: no restriction [A]
Built: 1924, Reconstructed: 1984
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 361.3 m = 1185.4 ft
Main Spans: 7 at 50.2 m = 164.7 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 48.8 m = 160.1 ft
Location
Springfield [67000]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
NORTH END BRIDGE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.4 metric ton = 62.0 tons (Load Factor(LF) [1])
Inventory: 33.8 metric ton = 37.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 31000 (2019) and Trucks: 6%
Future ADT: 23690 (In 2032 )
US 20 PARK AV CRCL over US 5 RIVERDALE ST (Route: 20)
Num:W210270U9DOTNBIx
Open: no restriction [A]
Built: 1952, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Frame [07]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 19.5 m = 64.0 ft
Main Spans: 2 at 9.6 m = 31.5 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 13.7 m = 44.9 ft (2 Lanes) and Out-To-Out: 172.5 m = 566.0 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
West Springfield [77850]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
AT NORTH END BRIDGE
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 72.3 metric ton = 79.5 tons (Allowable Stress(AS) [2])
Inventory: 39.3 metric ton = 43.2 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 35958 (2017) and Trucks: 3%
Future ADT: 66015 (In 2031 )
US 20 WB/PLAINFLD over RR BMRR (Route: 20)
Num:S240860ULDOTNBIx
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.8 m = 91.2 ft
Main Spans: 1 at 26.6 m = 87.3 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 11.6 m = 38.1 ft (3 Lanes) and Out-To-Out: 16.6 m = 54.5 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Springfield [67000]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
JUST W O0F I 91
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 37.6 metric ton = 41.4 tons (Load Factor(LF) [1])
Inventory: 22.5 metric ton = 24.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 14645 (2015) and Trucks: 20%
Future ADT: 26548 (In 2032 )
US 20 EB/PLAINFLD over RR BMRR (Route: 20)
Num:S240860UKDOTNBIx
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28.5 m = 93.5 ft
Main Spans: 1 at 27.3 m = 89.6 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Springfield [67000]: Hampden County [013], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
JUST W OF I 91
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 37.6 metric ton = 41.4 tons (Load Factor(LF) [1])
Inventory: 22.5 metric ton = 24.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 15870 (2015) and Trucks: 8%
Future ADT: 24099 (In 2032 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.