Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 29.6 m = 97.1 ft
Main Spans: 1 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 14.6 m = 47.9 ft (2 Lanes) and Out-To-Out: 19 m = 62.3 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Johnson City [38748]: Broome County [007], New York [36]
Owned by State Highway Agency [01], DOT District: 91
1.1 MI E JCT SH17C &SH201
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 98.9 metric ton = 108.8 tons (Load Factor(LF) [1])
Inventory: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 11121 (2016) and Trucks: 3%
Future ADT: 13509 (In 2039
)