Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 20.9 m = 68.6 ft (5 Lanes) and Out-To-Out: 26 m = 85.3 ft for a 21.1 m = 69.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Paw Paw [62980]: Van Buren County [159], Michigan [26]
Owned by State Highway Agency [01], DOT District: 5
IN PAW PAW
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.5 metric ton = 82.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 39.2 metric ton = 43.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 19936 (2007) and Trucks: 2%
Future ADT: 19469 (In 2018
)