Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 126.2 m = 414.1 ft
Main Spans: 4 at 39.3 m = 128.9 ft
Approach Spans: 0
Skew: 57
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 10.2 m = 33.5 ft for a 7.6 m = 24.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Marshall [51960]: Calhoun County [025], Michigan [26]
Owned by State Highway Agency [01], DOT District: 5
2.6 MI E OF I-94 BL
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 56.7 metric ton = 62.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34 metric ton = 37.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 3000 (2008) and Trucks: 2%
Future ADT: 3450 (In 2028
)