Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.7 m = 67.9 ft
Main Spans: 1 at 19.7 m = 64.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.1 m = 33.1 ft (2 Lanes) and Out-To-Out: 14.5 m = 47.6 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pittsfield [53960]: Berkshire County [003], Massachusetts [25]
Owned by City or Municipal Highway Agency [04], DOT District: 1
AT DEWEY AVE.
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Allowable Stress(AS) [2])
Inventory: 36.6 metric ton = 40.3 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1400 (2008) and Trucks: 6%
Future ADT: 2211 (In 2031
)