Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 34.1 m = 111.9 ft
Main Spans: 3 at 13.4 m = 44.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.1 m = 26.6 ft (2 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Vermontville [81980]: Eaton County [045], Michigan [26]
Owned by County Highway Agency [02], DOT District: 6
0.5 MI S OF VERMONTVILLE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 13.5 / H 15 [2]
Operating: 59 metric ton = 64.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 35.3 metric ton = 38.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 2.6 km = 1.6 mi
Traffic
ADT: 2700 (2018) and Trucks: 2%
Future ADT: 3200 (In 2038
)