HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 19


"190IX SB ON-RAMP """ over Perry Blvd.: Pearl St. & (Route: 0)
Num:00000000100157Ax
Open: no restriction [A]
Built: 1958, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 183.5 m = 602.1 ft
Main Spans: 4 at 37.2 m = 122.1 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 8.6 m = 28.2 ft (1 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
JCT OF SH 5 & I190
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Inventory: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5745 (2017) and Trucks: 7%
Future ADT: 6438 (In 2039 )
MAIN AND PEARL ST over CSX TRANS/AMTRAK (Route: 0)
Num:2263940x
Open: no restriction [A]
Built: 1944, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.5 m = 41.0 ft
Main Spans: 1 at 10.9 m = 35.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 138.2 m = 453.4 ft (6 Lanes) and Out-To-Out: 150.6 m = 494.1 ft for a 32.9 m = 107.9 ft approaching roadway.
Vertical Clearance: 4.64 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 53
0.1 MI S JCT RTS I190 ' 5
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 62.4 metric ton = 68.6 tons ()
Inventory: 26.3 metric ton = 28.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 1156 (2019) and Trucks: 3%
Future ADT: 1220 (In 2039 )
WASHINGTON STREET over RTE I190: CSX TRANS/AMTR (Route: 0)
Num:2260520x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 15.2 m = 49.9 ft
Main Spans: 1 at 14 m = 45.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 20 m = 65.6 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 5.51 m = 18.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 53
0.1 MI E JCT RTS 5 'I-190
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 68 metric ton = 74.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 4664 (2019) and Trucks: 10%
Future ADT: 4925 (In 2039 )
RTE 5 over RTE I190: BUFFALO RIVER: (Route: 5)
Num:1001579x
Open: no restriction [A]
Built: 1956, Reconstructed: 2019
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 1769.1 m = 5804.4 ft
Main Spans: 49 at 106.1 m = 348.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.3 m = 56.8 ft (4 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 17.4 m = 57.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 30.4 m = 99.7 ft
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
JCT OF RTS 5 & I-190
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 80.6 metric ton = 88.7 tons ()
Inventory: 29.4 metric ton = 32.3 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 36506 (2019) and Trucks: 6%
Future ADT: 42303 (In 2039 )
RTE I190 over RTE 5: CSX TRANS/AMTRAK: (Route: 190)
Num:5520159x
Open: no restriction [A]
Built: 1959, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 2224.4 m = 7298.3 ft
Main Spans: 112 at 30.8 m = 101.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 29.4 m = 96.5 ft (6 Lanes) and Out-To-Out: 31.3 m = 102.7 ft for a 29.9 m = 98.1 ft approaching roadway.
Vertical Clearance: 4.42 m = 14.5 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
0.4 MI E INT N6 I 190
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 91993 (2018) and Trucks: 11%
Future ADT: 103096 (In 2039 )
RTE 951K over BUFFALO SKYWAY: LOWER TE (Route: 951)
Num:00000000100157Cx
Open: no restriction [A]
Built: 1969, Reconstructed: 2018
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 284.1 m = 932.1 ft
Main Spans: 15 at 27.1 m = 88.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.39 m = 14.4 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
JCT OF SH 5 & I190
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 82.7 metric ton = 91.0 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 10972 (2017) and Trucks: 7%
Future ADT: 11023 (In 2039 )
PEARL ST OFF RAMP over FRANKLIN STREET (Route: 0)
Num:00000000100157Bx
Open: no restriction [A]
Built: 1955, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 71.9 m = 235.9 ft
Main Spans: 5 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.4 m = 27.6 ft (2 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
JCT. OF RTS 5 + I190
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 88.9 metric ton = 97.8 tons (Load Factor(LF) [1])
Inventory: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 891 (2017) and Trucks: 1%
Future ADT: 1032 (In 2039 )
190IX SB ON-RAMP over 190IX SB OFF-RAMP V FR (Route: 0)
Num:00000000552015Ax
Open: no restriction [A]
Built: 1960, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 285.3 m = 936.1 ft
Main Spans: 16 at 26.5 m = 86.9 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.62 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N6 OF I190
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1739 (2015) and Trucks: 11%
Future ADT: 1948 (In 2039 )
ERIE ST & PERRY over CSX TRANS/AMTRAK (Route: 0)
Num:2260670x
Open: no restriction [A]
Built: 1945, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Frame [07]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.5 m = 41.0 ft
Main Spans: 1 at 10.9 m = 35.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 171.9 m = 564.0 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 4.29 m = 14.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 53
0.7 MI NW RTE 5'BUFFALO R
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design:
Operating: 62.4 metric ton = 68.6 tons ()
Inventory: 26.3 metric ton = 28.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8816 (2015) and Trucks: 4%
Future ADT: 10908 (In 2039 )
RTE I190 over ERIE STREET: CSX TRANS/A (Route: 190)
Num:00000000552015Fx
Open: no restriction [A]
Built: 1956, Reconstructed: 1991
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 264.6 m = 868.2 ft
Main Spans: 8 at 26.8 m = 87.9 ft
Approach Spans: 2
Skew: 7
Width, Roadway: 8.4 m = 27.6 ft (1 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
EXIT N7 OF I190
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Inventory: 28.1 metric ton = 30.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 13582 (2017) and Trucks: 9%
Future ADT: 15738 (In 2039 )
"190IX NB ON-RAMP """ over EXCHANGE STREET: CSX / A (Route: 0)
Num:00000000552015Ex
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 181.1 m = 594.2 ft
Main Spans: 12 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 7.5 m = 24.6 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N7 OF I190
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 60.8 metric ton = 66.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5110 (2015) and Trucks: 11%
Future ADT: 5726 (In 2039 )
190IX SB ON-RAMP over RTE I190: CSX / AMTRAK: (Route: 0)
Num:00000000552015Bx
Open: no restriction [A]
Built: 1960, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 295 m = 967.9 ft
Main Spans: 18 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 9.2 m = 30.2 ft (1 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 4.6 m = 15.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N6 OF I190
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8304 (2015) and Trucks: 11%
Future ADT: 9306 (In 2039 )
RTE I190 over RTE I190: CSX / Amtrak: (Route: 190)
Num:00000000552015Dx
Open: no restriction [A]
Built: 1960, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 471.8 m = 1548.0 ft
Main Spans: 26 at 25 m = 82.0 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 7.3 m = 24.0 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.64 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N6 OF I190
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 9246 (2015) and Trucks: 11%
Future ADT: 10361 (In 2039 )
190IX NB OFF-RAMP over EXCHANGE STREET: CSX / A (Route: 0)
Num:00000000552015Cx
Open: no restriction [A]
Built: 1960, Reconstructed: 1995
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 174.3 m = 571.9 ft
Main Spans: 9 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 11.4 m = 37.4 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N6 OF I190
Condition
Deck: Very Good [8]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 12448 (2015) and Trucks: 11%
Future ADT: 13950 (In 2039 )
RTE I190 over RTE 16 (Route: 190)
Num:1069940x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 33.5 m = 109.9 ft
Main Spans: 1 at 32.9 m = 107.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 17.4 m = 57.1 ft for a 16.8 m = 55.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
0.2 MI E JCT RTS 5 & 16
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 64.2 metric ton = 70.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 49.2 metric ton = 54.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 1669 (2015) and Trucks: 11%
Future ADT: 1924 (In 2039 )
190IX NB OFF-RAMP over RELIEF (Route: 0)
Num:00000000552015Hx
Open: no restriction [A]
Built: 1956, Reconstructed: 2000
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 144.5 m = 474.1 ft
Main Spans: 9 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
EXIT N7 OF I190
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5095 (2019) and Trucks: 4%
Future ADT: 5709 (In 2039 )
MICHIGAN AVENUE over 190I: CSX Rail road: Exc (Route: 0)
Num:2260610x
Open: no restriction [A]
Built: 2003, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 185 m = 607.0 ft
Main Spans: 8 at 27 m = 88.6 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 19.3 m = 63.3 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 4.42 m = 14.5 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 53
.2 MI SE JCT SH 5 & SH 16
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 91.6 metric ton = 100.8 tons (Load Factor(LF) [1])
Inventory: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 12437 (2019) and Trucks: 4%
Future ADT: 12561 (In 2039 )
RTE 950E over RTE I190: RELIEF (Route: 950)
Num:00000000552015Gx
Open: no restriction [A]
Built: 1956, Reconstructed: 1999
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 217.6 m = 713.9 ft
Main Spans: 12 at 18.2 m = 59.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 4.93 m = 16.2 ft and Navigational Clearance: 0 = N/A
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by State Highway Agency [01], DOT District: 53
EXIT N7 OF I190
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 88.9 metric ton = 97.8 tons (Load Factor(LF) [1])
Inventory: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 5387 (2017) and Trucks: 2%
Future ADT: 5412 (In 2039 )
MICHIGAN AVENUE over BUFFALO RIVER (Route: 0)
Num:2260450x
Open: no restriction [A]
Built: 1930, Reconstructed: 1996
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Lift [15]
Approach Span(s): Other [00]
Deck: Open Grating [3] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 75 m = 246.1 ft
Main Spans: 1 at 71.9 m = 235.9 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 4.29 m = 14.1 ft and Navigational Clearance: 30.4 m = 99.7 ft
Location
Buffalo [11000]: Erie County [029], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 53
.3 MI SW JCT SH5 & BUF RV
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design:
Operating: 99.9 metric ton = 109.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2241 (2019) and Trucks: 13%
Future ADT: 2772 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider