HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


I-475 over M-54 BR (SAGINAW ST) (Route: 475)
Num:2654x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 50.3 m = 165.0 ft
Main Spans: 3 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 39
Width, Roadway: 36.4 m = 119.4 ft (4 Lanes) and Out-To-Out: 37.1 m = 121.7 ft for a 35.9 m = 117.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 83.6 metric ton = 92.0 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 49.9 metric ton = 54.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 59000 (2007) and Trucks: 4%
Future ADT: 58830 (In 2018 )
I-475 over CSX RR & NB SERV RD(ABN) (Route: 475)
Num:2645x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 108.8 m = 357.0 ft
Main Spans: 4 at 45.4 m = 149.0 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 40.8 m = 133.9 ft (8 Lanes) and Out-To-Out: 41.5 m = 136.2 ft for a 41.4 m = 135.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Poor [4]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72.6 metric ton = 79.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 46.7 metric ton = 51.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 59000 (2007) and Trucks: 4%
Future ADT: 58830 (In 2018 )
I-475 over ATHERTON RD (Route: 475)
Num:2653x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 36.6 m = 120.1 ft
Main Spans: 3 at 18.7 m = 61.4 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 35.2 m = 115.5 ft (6 Lanes) and Out-To-Out: 37.2 m = 122.1 ft for a 35.9 m = 117.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.2 metric ton = 56.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 30.5 metric ton = 33.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 33250 (2016) and Trucks: 5%
Future ADT: 36700 (In 2036 )
I-475 over LEFT TURN LANE NO 3 (Route: 475)
Num:2690x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 30.2 m = 99.1 ft
Main Spans: 3 at 12 m = 39.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 35.2 m = 115.5 ft (6 Lanes) and Out-To-Out: 37.2 m = 122.1 ft for a 35.9 m = 117.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 33250 (2016) and Trucks: 5%
Future ADT: 36700 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider