HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 18


SAGINAW RD over THREAD CREEK (Route: 54)
Num:2557x
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 24
Width, Roadway: 21.3 m = 69.9 ft (4 Lanes) and Out-To-Out: 28.9 m = 94.8 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN FLINT 2000 BLK S SAGIN
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 69.3 metric ton = 76.2 tons (Load Factor(LF) [1])
Inventory: 42 metric ton = 46.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 13000 (1995) and Trucks: 4%
Future ADT: 13100 (In 2022 )
BARTON ROAD over THREAD CREEK (Route: 0)
Num:2850x
Posted for load [P]
Built: 1940, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 11.6 m = 38.1 ft
Main Spans: 1 at 11.2 m = 36.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 12.1 m = 39.7 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN FLINT
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 35.6 metric ton = 39.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 21.4 metric ton = 23.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4837 (2015) and Trucks: 3%
Future ADT: 5902 (In 2035 )
14TH ST over I-475 (Route: 0)
Num:2700x
Open: no restriction [A]
Built: 1971, Reconstructed: 2010
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 50.4 m = 165.4 ft
Main Spans: 2 at 24.2 m = 79.4 ft
Approach Spans: 0
Skew: 22
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 91.4 metric ton = 100.5 tons (Load Factor(LF) [1])
Inventory: 54.8 metric ton = 60.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 1794 (1992) and Trucks: 1%
Future ADT: 1982 (In 2012 )
I-475 over THREAD CREEK (Route: 475)
Num:2636x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 38.7 m = 127.0 ft (7 Lanes) and Out-To-Out: 39.3 m = 128.9 ft for a 39.9 m = 130.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 57 metric ton = 62.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34.3 metric ton = 37.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 59000 (2007) and Trucks: 4%
Future ADT: 58830 (In 2018 )
12TH ST over I-475 (Route: 2002)
Num:2655x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 72.2 m = 236.9 ft
Main Spans: 2 at 37.5 m = 123.0 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 20.2 m = 66.3 ft for a 14.3 m = 46.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 76.1 metric ton = 83.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 8322 (1995) and Trucks: 4%
Future ADT: 9195 (In 2015 )
BEACH STREET over THREAD CREEK (Route: 0)
Num:2857x
Posted for load [P]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 10.3 m = 33.8 ft
Main Spans: 1 at 9.7 m = 31.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 14.4 m = 47.2 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Serious [3]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 29.2 metric ton = 32.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 17.5 metric ton = 19.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 12
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 0 (0) and Trucks: 2%
Future ADT: 2048 (In 2015 )
S GRAND TRAVERSE over THREAD CREEK (Route: 2002)
Num:2848x
Open: no restriction [A]
Built: 1958, Reconstructed: 2013
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 14.5 m = 47.6 ft
Main Spans: 1 at 13 m = 42.7 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 14.3 m = 46.9 ft (4 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 14.3 m = 46.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN CITY OF FLINT
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 75.8 metric ton = 83.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 58.6 metric ton = 64.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7911 (2012) and Trucks: 5%
Future ADT: 8741 (In 2032 )
I-69 ON RMP&(9TH ) over I-69 & I-475 RAMP A (Route: 69)
Num:2661x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 40.5 m = 132.9 ft
Main Spans: 1 at 40.5 m = 132.9 ft
Approach Spans: 0
Skew: 59
Width, Roadway: 10.9 m = 35.8 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 11.2 m = 36.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Serious [3]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86 metric ton = 94.6 tons (Load Factor(LF) [1])
Inventory: 51.5 metric ton = 56.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 3650 (1982) and Trucks: 6%
Future ADT: 4198 (In 2002 )
I-69 EB over I-475 & I-475 RAMPS (Route: 69)
Num:2656x
Open: no restriction [A]
Built: 1970, Reconstructed: 2004
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 58.1 m = 190.6 ft
Main Spans: 2 at 30.4 m = 99.7 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 19.6 m = 64.3 ft (3 Lanes) and Out-To-Out: 20.4 m = 66.9 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 4.8 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT LVL 2
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 91.1 metric ton = 100.2 tons (Load Factor(LF) [1])
Inventory: 54.6 metric ton = 60.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 54300 (2012) and Trucks: 9%
Future ADT: 52848 (In 2018 )
I-475 RAMPS G & H over I-475RMPS E&F:I-69&475 (Route: 475)
Num:2660x
Open: no restriction [A]
Built: 1970, Reconstructed: 2004
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 177.1 m = 581.1 ft
Main Spans: 2 at 47.2 m = 154.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 16 m = 52.5 ft (4 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 17 m = 55.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.4 metric ton = 85.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 46.3 metric ton = 50.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8400 (1988) and Trucks: 7%
Future ADT: 9660 (In 2008 )
I-69 WB over I-475 & I-475 RAMPS (Route: 69)
Num:2657x
Open: no restriction [A]
Built: 1970, Reconstructed: 2004
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 58.2 m = 191.0 ft
Main Spans: 2 at 29.8 m = 97.8 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 20.2 m = 66.3 ft (3 Lanes) and Out-To-Out: 20.9 m = 68.6 ft for a 18.2 m = 59.7 ft approaching roadway.
Vertical Clearance: 4.42 m = 14.5 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT LVL 2
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 93.6 metric ton = 103.0 tons (Load Factor(LF) [1])
Inventory: 56.1 metric ton = 61.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 47657 (2007) and Trucks: 6%
Future ADT: 52848 (In 2018 )
I-475 RAMP F over I-69 & I-475 (Route: 475)
Num:2659x
Open: no restriction [A]
Built: 1970, Reconstructed: 2004
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 137.8 m = 452.1 ft
Main Spans: 2 at 45.7 m = 149.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.8 m = 25.6 ft (1 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 4.52 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 82.3 metric ton = 90.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 49.2 metric ton = 54.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 8200 (1988) and Trucks: 7%
Future ADT: 9430 (In 2008 )
W 12 TH STREET over THREAD CREEK (Route: 2002)
Num:2829x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 22.9 m = 75.1 ft
Main Spans: 1 at 21.6 m = 70.9 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 14.3 m = 46.9 ft (4 Lanes) and Out-To-Out: 19.2 m = 63.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
IN CITY OF FLINT
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 74.9 metric ton = 82.4 tons (Load Factor(LF) [1])
Inventory: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 6748 (2005) and Trucks: 10%
Future ADT: 12172 (In 2025 )
I-475 RAMP E over I-475 & I-69 (Route: 475)
Num:2658x
Open: no restriction [A]
Built: 1970, Reconstructed: 1998
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 137.8 m = 452.1 ft
Main Spans: 2 at 45.7 m = 149.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.8 m = 25.6 ft (1 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 4.5 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Fair [5]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 81 metric ton = 89.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 48.6 metric ton = 53.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 9800 (1998) and Trucks: 5%
Future ADT: 11000 (In 2020 )
SAGINAW ST over I-69 (Route: 0)
Num:2608x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 83.5 m = 274.0 ft
Main Spans: 2 at 43 m = 141.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 18 m = 59.1 ft (4 Lanes) and Out-To-Out: 22.4 m = 73.5 ft for a 17.9 m = 58.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 75.8 metric ton = 83.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 45.4 metric ton = 49.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 13
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 14650 (2011) and Trucks: 4%
Future ADT: 16200 (In 2031 )
BEACH ST (OLDM-56) over I-69 (Route: 0)
Num:2607x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 63.1 m = 207.0 ft
Main Spans: 2 at 33.3 m = 109.3 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 19 m = 62.3 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72.3 metric ton = 79.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 43.4 metric ton = 47.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 13
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2000 (2011) and Trucks: 1%
Future ADT: 2200 (In 2031 )
8TH ST SERVICE RD over I-475 RAMP D (Route: 69)
Num:2662x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 32 m = 105.0 ft
Main Spans: 1 at 32 m = 105.0 ft
Approach Spans: 0
Skew: 57
Width, Roadway: 14.6 m = 47.9 ft (3 Lanes) and Out-To-Out: 15.3 m = 50.2 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.5 metric ton = 95.2 tons (Load Factor(LF) [1])
Inventory: 51.8 metric ton = 57.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 13200 (1988) and Trucks: 3%
Future ADT: 15180 (In 2008 )
CHURCH ST over I-69 (Route: 0)
Num:2606x
Open: no restriction [A]
Built: 1970, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 55.1 m = 180.8 ft
Main Spans: 2 at 27.7 m = 90.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (4 Lanes) and Out-To-Out: 19 m = 62.3 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29000]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
IN FLINT
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: M 18 / H 20 [4]
Operating: 62.9 metric ton = 69.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 37.6 metric ton = 41.4 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5200 (2011) and Trucks: 3%
Future ADT: 5800 (In 2031 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider