HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


RTE 29A over EAST CANADA CREEK (Route: 29)
Num:1020740x
Open: no restriction [A]
Built: 1931, Reconstructed: 2018
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 34.7 m = 113.9 ft
Main Spans: 1 at 33.5 m = 109.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.7 m = 25.3 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stratford [71784]: Fulton County [035], New York [36]
Owned by State Highway Agency [01], DOT District: 21
8 MI W JCT RTS 10 & 29A
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 4.6 km = 2.9 mi
Traffic
ADT: 529 (2017) and Trucks: 6%
Future ADT: 551 (In 2039 )
DUGWAY ROAD over AYERS CREEK (Route: 0)
Num:2204090x
Open: no restriction [A]
Built: 1937, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.1 m = 29.9 ft
Main Spans: 1 at 8.2 m = 26.9 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 5.4 m = 17.7 ft (2 Lanes) and Out-To-Out: 5.6 m = 18.4 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stratford [71784]: Fulton County [035], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 21
AT STRATFORD
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 41.7 metric ton = 45.9 tons (Load Factor(LF) [1])
Inventory: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 13 (2016) and Trucks: 0%
Future ADT: 18 (In 2036 )
PISECO ROAD over AYERS CREEK (Route: 0)
Num:2204050x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Aluminum: Wrought Iron or Cast Iron [9] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface:
Bridge Dimensions
Length: 9.4 m = 30.8 ft
Main Spans: 1 at 7.6 m = 24.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stratford [71784]: Fulton County [035], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 21
AT VILLAGE OF STRATFORD
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design:
Operating: 78 metric ton = 85.8 tons ()
Inventory: 40.8 metric ton = 44.9 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Better than present minimum criteria [7]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 166 (2019) and Trucks: 6%
Future ADT: 232 (In 2039 )
CR24 PISECO ROAD over AYERS CREEK (Route: 0)
Num:2204060x
Posted for load [P]
Built: 1934, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.3 m = 24.0 ft
Main Spans: 1 at 6.7 m = 22.0 ft
Approach Spans: 0
Skew: 10
Width, Roadway: 6.5 m = 21.3 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Stratford [71784]: Fulton County [035], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 21
AT VILLAGE OF STRATFORD
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Inventory: 15.4 metric ton = 16.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 2020 [0520] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 166 (2019) and Trucks: 6%
Future ADT: 232 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider