Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.6 m = 34.8 ft
Main Spans: 1 at 10.6 m = 34.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 10.4 m = 34.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Akron [00720]: Tuscola County [157], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
16 MI S OF M-25
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 62.9 metric ton = 69.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 33 metric ton = 36.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 1825 (2007) and Trucks: 11%
Future ADT: 2004 (In 2018
)