HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


ESTHER SIMPLOT PK over ESTHERS POND (Route: 0)
Num:34105x
Open: no restriction [A]
Built: 2016, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 16.5 m = 54.1 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 8.7 m = 28.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boise [08700]: Ada County [001], Idaho [16]
Owned by City or Municipal Highway Agency [04], DOT District: 3
IN ESTHER SIMPLOT PARK
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 44.7 metric ton = 49.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34.3 metric ton = 37.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2018 [1118] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 80 (2019) and Trucks: 0%
Future ADT: 120 (In 2039 )
N. GARDEN ST over BOISE RIVER SLOUGH (Route: 0)
Num:26285x
Open: no restriction [A]
Built: 1964, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.3 m = 24.0 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.1 m = 26.6 ft (2 Lanes) and Out-To-Out: 12.4 m = 40.7 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Garden City [29620]: Ada County [001], Idaho [16]
Owned by County Highway Agency [02], DOT District: 3
IN GARDEN CITY;29TH ST.
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65.3 metric ton = 71.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 1600 (2019) and Trucks: 0%
Future ADT: 2400 (In 2039 )
STP 7343;MAIN ST over BOISE RIVER (Route: 7343)
Num:12775x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 86.6 m = 284.1 ft
Main Spans: 4 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 10.8 m = 35.4 ft (3 Lanes) and Out-To-Out: 17.8 m = 58.4 ft for a 11.1 m = 36.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boise [08700]: Ada County [001], Idaho [16]
Owned by County Highway Agency [02], DOT District: 3
IN BOISE;MAIN ST. WBL
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78.9 metric ton = 86.8 tons (Load Factor(LF) [1])
Inventory: 40.8 metric ton = 44.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 48
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13500 (2019) and Trucks: 7%
Future ADT: 20250 (In 2039 )
STP 7343;MAIN ST over BOISE RIVER SLOUGH (Route: 7343)
Num:12770x
Open: no restriction [A]
Built: 1965, Reconstructed: 1991
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 1 at 7.9 m = 25.9 ft
Approach Spans: 0
Skew: 27
Width, Roadway: 24.1 m = 79.1 ft (5 Lanes) and Out-To-Out: 48.7 m = 159.8 ft for a 24.1 m = 79.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boise [08700]: Ada County [001], Idaho [16]
Owned by County Highway Agency [02], DOT District: 3
IN BOISE;MAIN ST.WBL
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: February 2018 [0218] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10000 (2019) and Trucks: 6%
Future ADT: 15000 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider