Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 16.5 m = 54.1 ft
Main Spans: 1 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 8.7 m = 28.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Boise [08700]: Ada County [001], Idaho [16]
Owned by City or Municipal Highway Agency [04], DOT District: 3
IN ESTHER SIMPLOT PARK
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 44.7 metric ton = 49.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34.3 metric ton = 37.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2018 [1118] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 80 (2019) and Trucks: 0%
Future ADT: 120 (In 2039
)