Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 97.5 m = 319.9 ft
Main Spans: 1 at 76.2 m = 250.0 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11.2 m = 36.7 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 5.03 m = 16.5 ft and Navigational Clearance: 0 = N/A
Location
Bethel [05725]: Windsor County [027], Vermont [50]
Owned by State Highway Agency [01], DOT District: 4
0.2 MI W JCT. VT.12 N
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 45.9 metric ton = 50.5 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 34.2 metric ton = 37.6 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 7.4 km = 4.6 mi
Traffic
ADT: 3600 (2018) and Trucks: 14%
Future ADT: 3780 (In 2028
)