Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 28 m = 91.9 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 9 m = 29.5 ft (2 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Lane County [039], Oregon [41]
Owned by County Highway Agency [02], DOT District: 5
045 MI E HONEYMAN ST PARK
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.9 km = 0.6 mi
Traffic
ADT: 349 (2020) and Trucks: 10%
Future ADT: 379 (In 2025
)