Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Wood or Timber [7]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 2 at 4.6 m = 15.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5 m = 16.4 ft (2 Lanes) and Out-To-Out: 5.6 m = 18.4 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Deschutes County [017], Oregon [41]
Owned by County Highway Agency [02], DOT District: 10
0.12 MI SOU TUMALO RES RD
Condition
Deck: Very Good [8]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 13 metric ton = 14.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 10 metric ton = 11.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 34 (2020) and Trucks: 2%
Future ADT: 39 (In 2025
)