Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 67.7 m = 222.1 ft
Main Spans: 3 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.6 m = 28.2 ft (2 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Lisbon [42020]: Grafton County [009], New Hampshire [33]
Owned by City or Municipal Highway Agency [04], DOT District: 1
214 FT FROM NH RTE 112
Condition
Deck: Poor [4]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: November 2020 [1120] and Frequency: 16
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 2201 (2018) and Trucks: 4%
Future ADT: 3257 (In 2041
)