HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 14


CROSS ST SE over PRINGLE CRK (Route: 0)
Num:470614000x
Open: no restriction [A]
Built: 1928, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.1 m = 43.0 ft
Main Spans: 1 at 12.5 m = 41.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.2 m = 30.2 ft (2 Lanes) and Out-To-Out: 13.5 m = 44.3 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
1100 BLOCK
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 20.7 metric ton = 22.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 15.9 metric ton = 17.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 4000 (2020) and Trucks: 2%
Future ADT: 4495 (In 2025 )
12TH ST over PRINGLE CREEK (Route: 0)
Num:470618000 00000x
Open: no restriction [A]
Built: 1930, Reconstructed: 1955
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.8 m = 42.0 ft
Main Spans: 2 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.3 m = 43.6 ft (2 Lanes) and Out-To-Out: 17.6 m = 57.7 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
BET LEWIS & HOWARD
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 22.7 metric ton = 25.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.5 metric ton = 19.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17251 (2020) and Trucks: 10%
Future ADT: 18001 (In 2025 )
13TH ST SE over PRINGLE CREEK (Route: 0)
Num:470620000 00000x
Open: no restriction [A]
Built: 1929, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.6 m = 61.0 ft
Main Spans: 2 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 60
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 18.7 m = 61.4 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
@ 13TH ST & LEWIS ST
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 27.2 metric ton = 29.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 15114 (2020) and Trucks: 3%
Future ADT: 15864 (In 2025 )
Mission St On Ramp over Bike Path (Route: 0)
Num:16814 072C00650x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 11.6 m = 38.1 ft
Main Spans: 1 at 11.6 m = 38.1 ft
Approach Spans: 0
Skew: 27
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 40.2 metric ton = 44.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 31.1 metric ton = 34.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2800 (2018) and Trucks: 7%
Future ADT: 2800 (In 2030 )
Hwy 72 EB On Ramp over 13th St. & UPRR (Route: 72)
Num:16812E072 00645x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 327.7 m = 1075.2 ft
Main Spans: 4 at 43.6 m = 143.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 27.9 metric ton = 30.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.4 metric ton = 23.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 16350 (2018) and Trucks: 4%
Future ADT: 20350 (In 2038 )
OR 22 (Hwy 72) over 13th Street (Route: 22)
Num:16813 072C00647x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 25 m = 82.0 ft
Main Spans: 1 at 25 m = 82.0 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 25.4 m = 83.3 ft (4 Lanes) and Out-To-Out: 32.8 m = 107.6 ft for a 25.4 m = 83.3 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 58 metric ton = 63.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 44.7 metric ton = 49.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 32700 (2018) and Trucks: 4%
Future ADT: 40700 (In 2038 )
Hwy 72 WB Off Ramp over 13th & Shelton Ditch (Route: 72)
Num:16812W072 00645x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 205.4 m = 673.9 ft
Main Spans: 3 at 46.6 m = 152.9 ft
Approach Spans: 3
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 8.8 m = 28.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 28.8 metric ton = 31.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.7 km = 0.4 mi
Traffic
ADT: 17550 (2018) and Trucks: 4%
Future ADT: 20800 (In 2038 )
HWY 72 (OR 22) over 14th St. & UPRR (Route: 72)
Num:16812M072 00655x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 158.8 m = 521.0 ft
Main Spans: 6 at 30.2 m = 99.1 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 19.5 m = 64.0 ft (4 Lanes) and Out-To-Out: 31.9 m = 104.7 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 26.6 metric ton = 29.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.4 metric ton = 22.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1.3 km = 0.8 mi
Traffic
ADT: 32700 (2018) and Trucks: 4%
Future ADT: 40700 (In 2038 )
MISSION ST over PRINGLE CREEK (Route: 0)
Num:470612000 00008x
Posted for load [P]
Built: 1953, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.2 m = 63.0 ft
Main Spans: 3 at 5.8 m = 19.0 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 14.8 m = 48.6 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
BET WINTER & CAPITOL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 21.7 metric ton = 23.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 16.8 metric ton = 18.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 19501 (2020) and Trucks: 3%
Future ADT: 20251 (In 2025 )
13TH ST WEST over SHELTON DITCH (Route: 0)
Num:470414000x
Open: no restriction [A]
Built: 1988, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 62.8 m = 206.0 ft
Main Spans: 3 at 33.5 m = 109.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.9 m = 29.2 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
13TH AND LESLIE ST
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 13876 (2020) and Trucks: 5%
Future ADT: 18483 (In 2025 )
13TH ST EAST over SHELTON DITCH (Route: 0)
Num:470415000 00000x
Open: no restriction [A]
Built: 1975, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 33.8 m = 110.9 ft
Main Spans: 3 at 23.2 m = 76.1 ft
Approach Spans: 0
Skew: 50
Width, Roadway: 7.2 m = 23.6 ft (1 Lanes) and Out-To-Out: 11.4 m = 37.4 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 4.95 m = 16.2 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
PARALLEL TO 470414
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 19501 (2020) and Trucks: 10%
Future ADT: 26884 (In 2025 )
14TH ST SE over SHELTON DITCH (Route: 0)
Num:470420000 00111x
Open: no restriction [A]
Built: 1962, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 26.2 m = 86.0 ft
Main Spans: 3 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 14.1 m = 46.3 ft (2 Lanes) and Out-To-Out: 18.4 m = 60.4 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
BET MISSION & OAK
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 29.8 metric ton = 32.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23 metric ton = 25.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5982 (2020) and Trucks: 10%
Future ADT: 6722 (In 2025 )
Hwy 72 (12th St) over Shelton Ditch (Route: 72)
Num:08111 072 00623x
Open: no restriction [A]
Built: 1929, Reconstructed: 1956
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.7 m = 44.9 ft
Main Spans: 1 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 14 m = 45.9 ft (3 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by State Highway Agency [01], DOT District: 3
CITY OF SALEM
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Inventory: 34.5 metric ton = 38.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 17550 (2018) and Trucks: 4%
Future ADT: 20800 (In 2038 )
WINTER ST SE over PRINGLE CREEK (Route: 0)
Num:470610000x
Open: no restriction [A]
Built: 1930, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 11.9 m = 39.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 16.6 m = 54.5 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salem [64900]: Marion County [047], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 3
AT HOSPITAL
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 8251 (2020) and Trucks: 5%
Future ADT: 9001 (In 2025 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider