HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


MSAS 109 over I 35E (Route: 109)
Num:62927x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 57 m = 187.0 ft
Main Spans: 2 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 2
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 18.1 m = 59.4 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
1.8 MI S OF JCT TH 36
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 46.7 metric ton = 51.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5400 (2015) and Trucks: 0%
Future ADT: 5400 (In 2039 )
MUN 327 over I 35E (Route: 327)
Num:62928x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 57 m = 187.0 ft
Main Spans: 2 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 14.3 m = 46.9 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
1.4 MI S OF JCT TH 36
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 51.2 metric ton = 56.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.9 metric ton = 41.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5200 (2016) and Trucks: 0%
Future ADT: 5200 (In 2039 )
MUN 1824 over SEWER (Route: 1824)
Num:62581x
Open: no restriction [A]
Built: 1996, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 21.6 m = 70.9 ft
Main Spans: 1 at 20.7 m = 67.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 15.9 m = 52.2 ft (3 Lanes) and Out-To-Out: 22.1 m = 72.5 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 5
200 N OF MARYLAND
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 69.8 metric ton = 76.8 tons (Load Factor(LF) [1])
Inventory: 41.8 metric ton = 46.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1000 (1992) and Trucks: 0%
Future ADT: 1000 (In 2029 )
CSAH 31 over I 35E (Route: 31)
Num:62626x
Open: no restriction [A]
Built: 2012, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 64.2 m = 210.6 ft
Main Spans: 2 at 31.3 m = 102.7 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 28.3 m = 92.9 ft (5 Lanes) and Out-To-Out: 37 m = 121.4 ft for a 28.3 m = 92.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.3 MI S OF JCT TH 36
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 58.6 metric ton = 64.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.3 metric ton = 41.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 28500 (2011) and Trucks: 0%
Future ADT: 28500 (In 2032 )
CSAH 30 over I 35E (Route: 30)
Num:62646x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 57 m = 187.0 ft
Main Spans: 2 at 28 m = 91.9 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 19.8 m = 65.0 ft (4 Lanes) and Out-To-Out: 23.1 m = 75.8 ft for a 19.8 m = 65.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
St. Paul [58000]: Ramsey County [123], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
1.3 MI S OF JCT TH 36
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 53.8 metric ton = 59.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.6 metric ton = 41.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 16600 (2015) and Trucks: 2%
Future ADT: 16600 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider