MSAS 454 over BNSF NORTHTOWN YARD (Route: 454)
Num:27B97x
Open: no restriction [A]
Built: 2016, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 170.8 m = 560.4 ft
Main Spans: 1 at 93 m = 305.1 ft
Approach Spans: 2
Skew: 27
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 16.6 m = 54.5 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 5.82 m = 19.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 5
0.2 MI W OF UNIVERSITY A
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 44.1 metric ton = 48.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34 metric ton = 37.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7224 (2018) and Trucks: 0%
Future ADT: 8011 (In 2035 )
MSAS 454 over TH 47 (University Ave) (Route: 454)
Num:27055x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 70.6 m = 231.6 ft
Main Spans: 3 at 37.7 m = 123.7 ft
Approach Spans: 0
Skew: 8
Width, Roadway: 9.6 m = 31.5 ft (2 Lanes) and Out-To-Out: 16.1 m = 52.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.8 MI S OF JCT TH 694
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 73.3 metric ton = 80.6 tons (Load Factor(LF) [1])
Inventory: 43.9 metric ton = 48.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3100 (2017) and Trucks: 0%
Future ADT: 3100 (In 2039 )
MN 47 over CP RAIL (Route: 47)
Num:27059x
Open: no restriction [A]
Built: 1997, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 87.2 m = 286.1 ft
Main Spans: 4 at 24.6 m = 80.7 ft
Approach Spans: 0
Skew: 4
Width, Roadway: 22.8 m = 74.8 ft (4 Lanes) and Out-To-Out: 30.3 m = 99.4 ft for a 26.2 m = 86.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by State Highway Agency [01], DOT District: 5
2.7 MI S OF JCT TH 694
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 47.7 metric ton = 52.5 tons (Load Factor(LF) [1])
Inventory: 34.1 metric ton = 37.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13781 (2019) and Trucks: 7%
Future ADT: 13700 (In 2039 )
MSAS 454 over CP RAIL (Route: 454)
Num:27074x
Open: no restriction [A]
Built: 1998, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 4 at 15.4 m = 50.5 ft
Approach Spans: 0
Skew: 6
Width, Roadway: 9.6 m = 31.5 ft (2 Lanes) and Out-To-Out: 16.1 m = 52.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Minneapolis [43000]: Hennepin County [053], Minnesota [27]
Owned by Local Park: Forest: or Reservation Agency [12], DOT District: 5
0.1 MI E OF UNIVERSITY A
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 72.7 metric ton = 80.0 tons (Load Factor(LF) [1])
Inventory: 43.4 metric ton = 47.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 3100 (2017) and Trucks: 0%
Future ADT: 3100 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.