HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 7


US 26 (HWY 026) over WILLAMETTE RIVER/OPR (Route: 26)
Num:05054 026 00077x
Open: no restriction [A]
Built: 1926, Reconstructed: 2000
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Concrete continuous [2] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 1113.4 m = 3653.1 ft
Main Spans: 5 at 163.1 m = 535.1 ft
Approach Spans: 29
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (4 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 39.3 m = 128.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
IN SE PORTLAND
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.6 metric ton = 16.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 60100 (2018) and Trucks: 2%
Future ADT: 64700 (In 2038 )
US 26 (HWY 026)CO over Railroad (Route: 26)
Num:06767 026 00099x
Open: no restriction [A]
Built: 1956, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 157.6 m = 517.1 ft
Main Spans: 6 at 34.1 m = 111.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (1 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 5.5 m = 18.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
1.5 MI SE PORTLAND CC
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.9 metric ton = 28.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.8 metric ton = 21.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11800 (2018) and Trucks: 2%
Future ADT: 10100 (In 2030 )
US 26 (HWY 026) over HWY 1E (Route: 26)
Num:06767A026 00098x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 39.5 m = 129.6 ft
Main Spans: 2 at 28.5 m = 93.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13 m = 42.7 ft (4 Lanes) and Out-To-Out: 15.7 m = 51.5 ft for a 13 m = 42.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
AT E BANK WILLAMETTE R
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 27.5 metric ton = 30.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 60100 (2018) and Trucks: 2%
Future ADT: 64700 (In 2038 )
Port. Mil Lt Rail over WILLAMETTE RIVER (Route: 0)
Num:22258 000 00000x
Open: no restriction [A]
Built: 2015, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stayed girder [14]
Approach Span(s): Prestressed concrete continuous [6] Girder and floorbeam system [03]
Deck: Open Grating [3] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 524.3 m = 1720.2 ft
Main Spans: 3 at 237.7 m = 779.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12.7 m = 41.7 ft (2 Lanes) and Out-To-Out: 23 m = 75.5 ft for a 12.7 m = 41.7 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 23.6 m = 77.4 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by Other Local Agencies [25], DOT District: 2
WILLAMETTE RIVER MP 13.2
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 80 metric ton = 88.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 61.9 metric ton = 68.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 630 (2020) and Trucks: 0%
Future ADT: 695 (In 2025 )
Hwy 081 over Grand Ave (Route: 99)
Num:02097 01E 00159x
Open: no restriction [A]
Built: 1937, Reconstructed: 1955
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 316.1 m = 1037.1 ft
Main Spans: 27 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.6 m = 54.5 ft (3 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 30.3 m = 99.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
1.5 MI SE PORTLAND CC
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 20.1 metric ton = 22.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 15.6 metric ton = 17.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 71600 (2018) and Trucks: 4%
Future ADT: 79800 (In 2038 )
OR 99E(HWY 1E) over UPRR & DIVISION ST (Route: 99)
Num:19667 081 00105x
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 338.6 m = 1110.9 ft
Main Spans: 9 at 41.2 m = 135.2 ft
Approach Spans: 3
Skew: 14
Width, Roadway: 19.2 m = 63.0 ft (4 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
1.5 MI SE PORTLAND CC
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.8 metric ton = 21.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 71600 (2018) and Trucks: 4%
Future ADT: 79800 (In 2038 )
I-5 (HWY 001) over WILLAMETTE RIVER MARQUAM (Route: 5)
Num:08328 001 30038x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 318.2 m = 1044.0 ft
Main Spans: 3 at 134.1 m = 440.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 33.8 m = 110.9 ft (8 Lanes) and Out-To-Out: 40.8 m = 133.9 ft for a 16.9 m = 55.4 ft approaching roadway.
Vertical Clearance: 4.7 m = 15.4 ft and Navigational Clearance: 21.9 m = 71.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
1.1 MI S OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.3 metric ton = 27.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.4 metric ton = 21.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 1 km = 0.6 mi
Traffic
ADT: 139800 (2018) and Trucks: 9%
Future ADT: 153700 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider