HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 30


HWY 1W (STEEL BR) over WILLAMETTE RIVER (Route: 99)
Num:06683 01WX00036x
Open: no restriction [A]
Built: 1910, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Truss - Deck [09]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 243.8 m = 799.9 ft
Main Spans: 1 at 91.4 m = 299.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 19.5 m = 64.0 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 5.41 m = 17.8 ft and Navigational Clearance: 48.8 m = 160.1 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by Railroad [27], DOT District: 2
0.4 MI NE PORTLAND CC
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.8 metric ton = 21.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 11600 (2018) and Trucks: 4%
Future ADT: 16600 (In 2038 )
OR 99W (HWY 001W) over STEEL BR. E. APPR. (Route: 99)
Num:06683B01WX00046x
Open: no restriction [A]
Built: 1910, Reconstructed: 1985
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 92.7 m = 304.1 ft
Main Spans: 7 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (1 Lanes) and Out-To-Out: 13.4 m = 44.0 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
E. END OF STEEL BRIDGE
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 24.6 metric ton = 27.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5800 (2018) and Trucks: 4%
Future ADT: 8300 (In 2038 )
HWY 1W NB over FRONT AVE TO STEEL BR (Route: 99)
Num:02733C01WX00014x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 171.2 m = 561.7 ft
Main Spans: 10 at 27.8 m = 91.2 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
AT W END OF STEEL BRIDGE
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Inventory: 14.5 metric ton = 16.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5800 (2018) and Trucks: 4%
Future ADT: 8300 (In 2038 )
OR 99W/HOLLADAY RP over B-146 STEEL BR RP X UPRR (Route: 99)
Num:06683D01WX00044x
Open: no restriction [A]
Built: 1952, Reconstructed: 1985
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 96.9 m = 317.9 ft
Main Spans: 6 at 30.8 m = 101.1 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.4 m = 27.6 ft (1 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
NE END OF STEEL BRIDGE
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 10 metric ton = 11.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 7.8 metric ton = 8.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8742 (2020) and Trucks: 7%
Future ADT: 12448 (In 2025 )
HWY 1W/EVERETT RMP over FRONT AVENUE (Route: 99)
Num:02733B01WX00052x
Open: no restriction [A]
Built: 1950, Reconstructed: 1985
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 70.7 m = 232.0 ft
Main Spans: 4 at 18.4 m = 60.4 ft
Approach Spans: 0
Skew: 99
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9 m = 29.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
AT WEST END OF STEEL BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 16.2 metric ton = 17.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 12.6 metric ton = 13.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4100 (2018) and Trucks: 4%
Future ADT: 8239 (In 2030 )
NW EVERETT over B-128 1ST TO FRONT AVE (Route: 9314)
Num:25B128000000000x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 53.6 m = 175.9 ft
Main Spans: 7 at 7.6 m = 24.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (1 Lanes) and Out-To-Out: 9 m = 29.5 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
NW EVERETT ST @ NW 1ST AV
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 24.3 metric ton = 26.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 18.8 metric ton = 20.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 7203 (2020) and Trucks: 10%
Future ADT: 9853 (In 2025 )
HWY 1W/GLISAN RAMP over FRONT AVE & UPRR (Route: 99)
Num:06683A01WX00031x
Open: no restriction [A]
Built: 1950, Reconstructed: 1985
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 153.9 m = 504.9 ft
Main Spans: 9 at 31.1 m = 102.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.1 m = 43.0 ft (1 Lanes) and Out-To-Out: 17.1 m = 56.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
AT NW END OF STEEL BR.
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5400 (2018) and Trucks: 4%
Future ADT: 9801 (In 2027 )
OR 99W SB over B-152 INTERSTATE SEMI VI (Route: 99)
Num:07206 01WX00100x
Open: no restriction [A]
Built: 1950, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 110.3 m = 361.9 ft
Main Spans: 12 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (1 Lanes) and Out-To-Out: 5.5 m = 18.0 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
N INTERSTATE NR N DIXON
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 28.2 metric ton = 31.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.7 metric ton = 23.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 10579 (2020) and Trucks: 4%
Future ADT: 14440 (In 2025 )
NW 1ST over B-128B EVERETT COMPLEX (Route: 9355)
Num:25128B0025B128Bx
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 7 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.6 m = 15.1 ft (1 Lanes) and Out-To-Out: 6.5 m = 21.3 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
BTWN NW EVERETT/NW GLISAN
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons ()
Inventory: 30.8 metric ton = 33.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 417 (2020) and Trucks: 1%
Future ADT: 460 (In 2025 )
EVERETT over B-128A EVERETT COMPLEX (Route: 9314)
Num:25128A0025B128Ax
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 42.7 m = 140.1 ft
Main Spans: 5 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11 m = 36.1 ft (3 Lanes) and Out-To-Out: 15.2 m = 49.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
NW EVERETT ST W OF NW 1ST
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons ()
Inventory: 30.8 metric ton = 33.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11255 (2020) and Trucks: 1%
Future ADT: 15036 (In 2025 )
STEEL BRIDGE RAMP over B-128C EVERETT COMPLEX (Route: 9300)
Num:25128C0025B128Cx
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.6 m = 70.9 ft
Main Spans: 4 at 6.4 m = 21.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
FROM S BOUND FRONT AVE
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 27.9 metric ton = 30.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 21.4 metric ton = 23.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2477 (2020) and Trucks: 1%
Future ADT: 2807 (In 2025 )
STEEL BRIDGE RAMP over B-128D EVERETT COMPLEX (Route: 9314)
Num:25128D0025B128Dx
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 38.7 m = 127.0 ft
Main Spans: 7 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9.1 m = 29.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
E OF NW 1ST AVE/MAX (LRT)
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons ()
Inventory: 30.8 metric ton = 33.9 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8287 (2020) and Trucks: 1%
Future ADT: 10447 (In 2025 )
HY 1 SB TO HY 2 EB over HWY 1 I-5 (Route: 84)
Num:08588C002 00020x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 556.9 m = 1827.2 ft
Main Spans: 15 at 42.7 m = 140.1 ft
Approach Spans: 3
Skew: 0
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.5 MI E OF PORTLAND CC
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 18.8 metric ton = 20.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.6 metric ton = 16.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 71650 (2018) and Trucks: 4%
Future ADT: 76250 (In 2038 )
I-5 (HWY 001) SB over UPRR (Route: 5)
Num:S8588E001 30170x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 686.1 m = 2251.1 ft
Main Spans: 22 at 65.5 m = 214.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.8 m = 35.4 ft for a 9.4 m = 30.8 ft approaching roadway.
Vertical Clearance: 4.88 m = 16.0 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 28.8 metric ton = 31.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 39600 (2018) and Trucks: 9%
Future ADT: 47650 (In 2038 )
I-5 (HWY 001) NB over UPRR (Route: 5)
Num:N8588E001 30170x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 686.1 m = 2251.1 ft
Main Spans: 22 at 66.1 m = 216.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 9.5 m = 31.2 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 9.5 m = 31.2 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 18.1 metric ton = 19.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 14.3 metric ton = 15.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 39600 (2018) and Trucks: 9%
Future ADT: 47650 (In 2038 )
I-84 (HWY 002) CON over CITY STREET (Route: 84)
Num:H8588A002 00002x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 195.2 m = 640.5 ft
Main Spans: 7 at 47 m = 154.2 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 7.9 m = 25.9 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.5 MI E PORTLAND CC
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 33.4 metric ton = 36.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 2000 (2018) and Trucks: 4%
Future ADT: 2900 (In 2030 )
BURNSIDE ST over WEST BURNSIDE APPROACH (Route: 9326)
Num:00511A932600000x
Posted for other load-capacity restriction [R]
Built: 1927, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 188.4 m = 618.1 ft
Main Spans: 3 at 19.2 m = 63.0 ft
Approach Spans: 16
Skew: 0
Width, Roadway: 20.7 m = 67.9 ft (5 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WEST END BURNSIDE BR
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Inventory: 13.6 metric ton = 15.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 60407 (2020) and Trucks: 10%
Future ADT: 90674 (In 2025 )
I-5 (HWY 001) over Multnomah & HOLLADAY (Route: 5)
Num:08583 001 30199x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 133.2 m = 437.0 ft
Main Spans: 7 at 24.4 m = 80.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 31.1 m = 102.0 ft (6 Lanes) and Out-To-Out: 33.3 m = 109.3 ft for a 31.1 m = 102.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.5 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 66.2 metric ton = 72.8 tons (Load Factor(LF) [1])
Inventory: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 118400 (2018) and Trucks: 9%
Future ADT: 121900 (In 2038 )
BURNSIDE BRIDGE over WILLAMETTE RIVER (Route: 9326)
Num:00511 000000000x
Open: no restriction [A]
Built: 1926, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Truss - Deck [09]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 260.9 m = 856.0 ft
Main Spans: 1 at 81.1 m = 266.1 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 20.7 m = 67.9 ft (5 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 5.26 m = 17.3 ft and Navigational Clearance: 19.5 m = 64.0 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILLAMETTE RIVER MP 12.4
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: Railroad [8]
Operating: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Inventory: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 58125 (2020) and Trucks: 10%
Future ADT: 87161 (In 2025 )
HY 2 WB TO HY 1 NB over UPRR (Route: 84)
Num:08588A002 00024x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 464.5 m = 1524.0 ft
Main Spans: 6 at 59.9 m = 196.5 ft
Approach Spans: 11
Skew: 0
Width, Roadway: 6.4 m = 21.0 ft (1 Lanes) and Out-To-Out: 8 m = 26.2 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.5 MI E PORTLAND CC
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 21.1 metric ton = 23.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 16.2 metric ton = 17.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 71650 (2018) and Trucks: 4%
Future ADT: 76250 (In 2038 )
WB CON TO HWY 1 SB over HWY 1 (Route: 84)
Num:08588B002 00002x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 432.5 m = 1419.0 ft
Main Spans: 12 at 41.1 m = 134.8 ft
Approach Spans: 4
Skew: 0
Width, Roadway: 9.8 m = 32.2 ft (4 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.1 MI E PORTLAND CC
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.8 metric ton = 21.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 54600 (2018) and Trucks: 4%
Future ADT: 85890 (In 2030 )
HY 1 NB TO HY 2 over UPRR & CONN 6 (Route: 5)
Num:08588D001 30150x
Open: no restriction [A]
Built: 1963, Reconstructed: 1995
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Box beam or girders - Multiple [05]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 476.7 m = 1564.1 ft
Main Spans: 9 at 44.5 m = 146.0 ft
Approach Spans: 14
Skew: 99
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 11.3 m = 37.1 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 4.52 m = 14.8 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.1 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 25.9 metric ton = 28.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.1 metric ton = 22.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 47500 (2018) and Trucks: 9%
Future ADT: 32300 (In 2030 )
BURNSIDE ST over EAST BURNSIDE APPROACH (Route: 9326)
Num:00511B932600000x
Posted for other load-capacity restriction [R]
Built: 1927, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 261.8 m = 859.0 ft
Main Spans: 8 at 32.9 m = 107.9 ft
Approach Spans: 7
Skew: 0
Width, Roadway: 20.7 m = 67.9 ft (5 Lanes) and Out-To-Out: 26.2 m = 86.0 ft for a 20.7 m = 67.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
EAST END BURNSIDE BR
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 22.7 metric ton = 25.0 tons (Load Factor(LF) [1])
Inventory: 13.6 metric ton = 15.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 58691 (2020) and Trucks: 10%
Future ADT: 88033 (In 2025 )
N BROADWAY ST over INTERSTATE AVE (Route: 9300)
Num:06757C609300000x
Open: no restriction [A]
Built: 1949, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 38.1 m = 125.0 ft
Main Spans: 2 at 15.5 m = 50.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14 m = 45.9 ft (4 Lanes) and Out-To-Out: 27.4 m = 89.9 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
EAST END BROADWAY BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 52.6 metric ton = 57.9 tons (Load Factor(LF) [1])
Inventory: 31.8 metric ton = 35.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: March 1999 [399] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 30388 (2020) and Trucks: 10%
Future ADT: 45210 (In 2025 )
BROADWAY ST over WILLAMETTE RIVER (Route: 9300)
Num:06757 000000000x
Open: no restriction [A]
Built: 1912, Reconstructed: 1927
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Steel [3] Mixed types [20]
Deck: Other [9] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 531 m = 1742.2 ft
Main Spans: 1 at 92.7 m = 304.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 13.9 m = 45.6 ft (4 Lanes) and Out-To-Out: 21.5 m = 70.5 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 3.99 m = 13.1 ft and Navigational Clearance: 27.4 m = 89.9 ft
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by County Highway Agency [02], DOT District: 2
WILLAMETTE RIVER MP 11.7
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: Railroad [8]
Operating: 25.6 metric ton = 28.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.8 metric ton = 21.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 30871 (2020) and Trucks: 10%
Future ADT: 45210 (In 2025 )
Weidler St over Hwy 001 (Route: 0)
Num:08575 001 30229x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 45.1 m = 148.0 ft
Main Spans: 3 at 15.8 m = 51.8 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.8 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36.3 metric ton = 39.9 tons (Load Factor(LF) [1])
Inventory: 21.8 metric ton = 24.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16994 (2010) and Trucks: 1%
Future ADT: 32388 (In 2030 )
Hwy 081 NB over Hwy 2 & UPRR (Route: 99)
Num:02350A01EX00020x
Open: no restriction [A]
Built: 1908, Reconstructed: 1960
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Girder and floorbeam system [03]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 141.4 m = 463.9 ft
Main Spans: 11 at 27.4 m = 89.9 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 24.4 m = 80.1 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.1 MI E PORTLAND CC
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 29.9 metric ton = 32.9 tons (Load Factor(LF) [1])
Inventory: 18.1 metric ton = 19.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: January 2021 [0121] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 35800 (2018) and Trucks: 4%
Future ADT: 39900 (In 2038 )
Williams Ave. over Hwy 001 (Route: 0)
Num:08575Q001 30233x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 2 at 29.3 m = 96.1 ft
Approach Spans: 0
Skew: 61
Width, Roadway: 13.6 m = 44.6 ft (3 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 13.6 m = 44.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.8 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 16994 (2010) and Trucks: 16%
Future ADT: 32388 (In 2030 )
HWY 1 TO MORRISON over HWY 1 SB CONN 7 (Route: 5)
Num:08589C001 30150x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete [1] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 426.1 m = 1398.0 ft
Main Spans: 15 at 41.1 m = 134.8 ft
Approach Spans: 1
Skew: 99
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.3 MI S OF BURNSIDE BR
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 11.3 metric ton = 12.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 8.7 metric ton = 9.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 14700 (2018) and Trucks: 9%
Future ADT: 12000 (In 2030 )
Broadway St. over Hwy 001 (Route: 0)
Num:08575R001 30235x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Concrete [1] Slab [01]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 32.2 m = 105.6 ft
Main Spans: 2 at 16.3 m = 53.5 ft
Approach Spans: 1
Skew: 30
Width, Roadway: 16.2 m = 53.2 ft (3 Lanes) and Out-To-Out: 21.3 m = 69.9 ft for a 16.2 m = 53.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.8 MI N OF BURNSIDE BR
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Inventory: 25.4 metric ton = 27.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2021 [0221] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 16994 (2010) and Trucks: 1%
Future ADT: 32388 (In 2030 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider