Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 1 at 7.3 m = 24.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.9 m = 16.1 ft (2 Lanes) and Out-To-Out: 5.6 m = 18.4 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cedarville [14240]: Menominee County [109], Michigan [26]
Owned by County Highway Agency [02], DOT District: 1
8 MI. NE OF DAGGETT
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design:
Operating: 14.6 metric ton = 16.1 tons (Load Factor(LF) [1])
Inventory: 8.8 metric ton = 9.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: June 2020 [0620] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 86 (1998) and Trucks: 0%
Future ADT: 40 (In 2019
)