HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


HWY 100 over MULTNOMAH CREEK (Route: 30)
Num:04534 125 01972x
Open: no restriction [A]
Built: 1914, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 12.2 m = 40.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.6 m = 21.7 ft (2 Lanes) and Out-To-Out: 7.3 m = 24.0 ft for a 6.6 m = 21.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
AT MULTNOMAH FALLS
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 28.5 metric ton = 31.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22 metric ton = 24.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 1200 (2018) and Trucks: 3%
Future ADT: 2200 (In 2038 )
HWY 100 over W MULTNOMAH FALLS VIADUC (Route: 30)
Num:00840 125 01950x
Posted for load [P]
Built: 1914, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 122.5 m = 401.9 ft
Main Spans: 20 at 6.1 m = 20.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.3 m = 17.4 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.2 MI W MULTNOMAH FALLS
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 5.8 metric ton = 6.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 4.5 metric ton = 5.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Basically intolerable requiring high priority of replacement [2]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 1200 (2018) and Trucks: 3%
Future ADT: 2200 (In 2038 )
HWY 100 over E MULTNOMAH FALLS VIADUC (Route: 30)
Num:00841 125 02003x
Open: no restriction [A]
Built: 1914, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 262.4 m = 860.9 ft
Main Spans: 86 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.3 m = 17.4 ft (2 Lanes) and Out-To-Out: 6.1 m = 20.0 ft for a 5.3 m = 17.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Multnomah County [051], Oregon [41]
Owned by State Highway Agency [01], DOT District: 2
0.3 MI E MULTNOMAH FALLS
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 20.4 metric ton = 22.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 15.6 metric ton = 17.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 8 km = 5.0 mi
Traffic
ADT: 1200 (2018) and Trucks: 3%
Future ADT: 2200 (In 2038 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider