FESSENDEN ST over BURLINGTON NORTHERN R&R (Route: 9976)
Num:51T104000000000x
Open: no restriction [A]
Built: 1909, Reconstructed: N/A [0000]
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Deck [09]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 50 m = 164.1 ft
Main Spans: 1 at 27.4 m = 89.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 18.3 m = 60.0 ft for a 14 m = 45.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by Railroad [27], DOT District: 2
FESSENDEN ST. OVER BURLIN
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 24.9 metric ton = 27.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 19.1 metric ton = 21.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 4931 (2010) and Trucks: 10%
Future ADT: 9173 (In 2030 )
COLUMBIA BLVD over B-79 X N. COLUMBIA WAY (Route: 9956)
Num:09752 000 00215x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 69.2 m = 227.0 ft
Main Spans: 3 at 34.1 m = 111.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 19.4 m = 63.7 ft (4 Lanes) and Out-To-Out: 23 m = 75.5 ft for a 19.2 m = 63.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
N COL BLVD OVER N COL WAY
Condition
Deck: Poor [4]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36 metric ton = 39.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 27.9 metric ton = 30.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 19379 (2020) and Trucks: 25%
Future ADT: 20129 (In 2025 )
COLUMBIA BLVD over B-78 OVER BNRR (Route: 9956)
Num:09685 000 00223x
Open: no restriction [A]
Built: 1909, Reconstructed: 1988
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 45.1 m = 148.0 ft
Main Spans: 2 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 25
Width, Roadway: 11.2 m = 36.7 ft (2 Lanes) and Out-To-Out: 17.2 m = 56.4 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
IN N PORTLAND
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 30.1 metric ton = 33.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 23.3 metric ton = 25.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 13910 (2020) and Trucks: 25%
Future ADT: 15341 (In 2025 )
COLUMBIA BLVD over B-78A OVER BNRR (Route: 9956)
Num:09685A000000223x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 63.1 m = 207.0 ft
Main Spans: 2 at 23.8 m = 78.1 ft
Approach Spans: 2
Skew: 25
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
IN N PORTLAND
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 35.6 metric ton = 39.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 27.5 metric ton = 30.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13116 (2020) and Trucks: 25%
Future ADT: 14465 (In 2025 )
N PORTLAND RD over B-92 OVER UPRR (Route: 0)
Num:17965 000 B-92x
Open: no restriction [A]
Built: 1997, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 45.1 m = 148.0 ft
Main Spans: 3 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 11.6 m = 38.1 ft (2 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [59000]: Multnomah County [051], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 2
N OF COLUMBIA BLVD
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 56.7 metric ton = 62.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 43.7 metric ton = 48.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 12541 (2020) and Trucks: 10%
Future ADT: 13291 (In 2025 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.