Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Concrete continuous [2] Stringer/Multi-beam or girder [02]
Deck: Closed Grating [4] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 882.4 m = 2895.2 ft
Main Spans: 1 at 89.6 m = 294.0 ft
Approach Spans: 22
Skew: 0
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 17.6 m = 57.7 ft for a 13.1 m = 43.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 8.2 m = 26.9 ft
Location
Unknown [00000]: King County [033], Washington [53]
Owned by State Highway Agency [01], DOT District: 1
0.1 N JCT SR 509
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Poor [4]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 49293 (2019) and Trucks: 8%
Future ADT: 69601 (In 2039
)