HOWARD STREET over NORTH CHANNEL SPOKANE R (Route: 813)
Num:85296000000000x
Open: no restriction [A]
Built: 1909, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 64.6 m = 212.0 ft
Main Spans: 2 at 32.3 m = 106.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.5 m = 54.1 ft (2 Lanes) and Out-To-Out: 17.7 m = 58.1 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.85 N OF I-90
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 9 / H 10 [1]
Operating: 43.5 metric ton = 47.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 223 (2017) and Trucks: 1%
Future ADT: 90 (In 2039 )
HOWARD STREET over MIDDLE CHANNEL SPOKANE R (Route: 812)
Num:85293000000000x
Bridge closed to all traffic [K]
Built: 1916, Reconstructed: 1963
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Prestressed concrete [5] Tee beam [04]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 73.8 m = 242.1 ft
Main Spans: 1 at 59.1 m = 193.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 12.6 m = 41.3 ft for a 4.6 m = 15.1 ft approaching roadway.
Vertical Clearance: 4.78 m = 15.7 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
00.80 N OF I-90
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Serious [3]
Loading
Design: M 13.5 / H 15 [2]
Operating: 0 metric ton = 0.0 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 0 metric ton = 0.0 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural:
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 114 (2017) and Trucks: 0%
Future ADT: 250 (In 2039 )
Upper Falls access over Theme Stream (Route: 879)
Num:88010000000000x
Open: no restriction [A]
Built: 2013, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6 m = 19.7 ft (1 Lanes) and Out-To-Out: 6.3 m = 20.7 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
00.080 N of I 90
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 51.8 metric ton = 57.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 37.3 metric ton = 41.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 86 (2017) and Trucks: 1%
Future ADT: 650 (In 2039 )
WASHINGTON STREET over SPOKANE RIVER (Route: 809)
Num:86015000000000x
Open: no restriction [A]
Built: 1985, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 99.4 m = 326.1 ft
Main Spans: 3 at 48.8 m = 160.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 16.5 m = 54.1 ft (4 Lanes) and Out-To-Out: 22.6 m = 74.2 ft for a 16.2 m = 53.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.85 N OF I-90
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 68 metric ton = 74.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 18100 (2016) and Trucks: 1%
Future ADT: 40800 (In 2038 )
STEVENS STREET over SPOKANE RIVER (Route: 810)
Num:85309000000000x
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 113.7 m = 373.0 ft
Main Spans: 3 at 54.9 m = 180.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.75 N OF I-90
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 85.3 metric ton = 93.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 10462 (2017) and Trucks: 1%
Future ADT: 20400 (In 2042 )
POST STREET over SPOKANE RIVER (Route: 814)
Num:85287000000000x
Bridge closed to all traffic [K]
Built: 1917, Reconstructed: 1937
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Concrete [1] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 101.5 m = 333.0 ft
Main Spans: 1 at 78.9 m = 258.9 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (1 Lanes) and Out-To-Out: 16.5 m = 54.1 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
00.6 N OF I-90
Condition
Deck: Serious [3]
Superstructure: Critical [2]
Substructure: Serious [3]
Loading
Design: M 13.5 / H 15 [2]
Operating: 0 metric ton = 0.0 tons (No rating analysis or evaluation performed [5])
Inventory: 0 metric ton = 0.0 tons (No rating analysis or evaluation performed [5])
Appraisal
Structural:
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: May 1999 [599] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 1685 (2017) and Trucks: 0%
Future ADT: 5272 (In 2039 )
WASHINGTON STREET over SOUTH CHANNEL SPOKANE R (Route: 808)
Num:85308000000000x
Open: no restriction [A]
Built: 1973, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box Beam or girders - Single or Spread [06]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 99.4 m = 326.1 ft
Main Spans: 3 at 54.9 m = 180.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.75 N OF I-90
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 97.2 metric ton = 106.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 85.2 metric ton = 93.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge deck rehabilitation with only incidental widening. [36]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 13092 (2017) and Trucks: 3%
Future ADT: 20400 (In 2038 )
MONROE STREET over SPOKANE RIVER (Route: 815)
Num:85295000000000x
Open: no restriction [A]
Built: 1911, Reconstructed: 2005
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Arch - Deck [11]
Approach Span(s): Concrete continuous [2] Arch - Deck [11]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 272.2 m = 893.1 ft
Main Spans: 3 at 85.6 m = 280.9 ft
Approach Spans: 14
Skew: 0
Width, Roadway: 15.2 m = 49.9 ft (4 Lanes) and Out-To-Out: 21.6 m = 70.9 ft for a 15.5 m = 50.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Spokane [67000]: Spokane County [063], Washington [53]
Owned by City or Municipal Highway Agency [04], DOT District: 6
00.60 N OF I-90
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: M 18 / H 20 [4]
Operating: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 19900 (2017) and Trucks: 2%
Future ADT: 40000 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.