Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 30.5 m = 100.1 ft
Main Spans: 1 at 29 m = 95.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 14.6 m = 47.9 ft (3 Lanes) and Out-To-Out: 15.5 m = 50.9 ft for a 14.9 m = 48.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Spokane County [063], Washington [53]
Owned by State Highway Agency [01], DOT District: 6
14.7 E JCT SR 206
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 62.6 metric ton = 68.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2018 [0818] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 8.5 km = 5.3 mi
Traffic
ADT: 10114 (2019) and Trucks: 8%
Future ADT: 13026 (In 2039
)