Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
Views under the deck.
Views under the deck at easternmost span.
Views under the bridge showing the arches.
T-beam details.
Overviews of the support system.
Support details.
Railing details.
1930 date stamp on support.
Design on arches.
A section of the concrete on this support fell off at some point. The pieces of concrete are still strewn around the pier.
Back |
Home |
Top |