Uncredited photos on this page taken by: Nathan Holth. Unless stated in a caption, all photos are Copyright with All Rights Reserved. Learn about reuse of our photos.
Note: Directions assume a north-south alignment of bridge.
Distant elevated view of both bridges from southwest quadrant on Florida Street in Ashland.
Distant elevated view of historic bridge from southwest quadrant on Florida Street in Ashland.
Overview from Florida Street in Ashland.
Portal views facing north.
Views of truss spans from sidewalk, facing north.
Views beside abutment from southwest quadrant.
Views beside bridge from southwest quadrant.
View on sidewalk facing north.
Plaque.
Carnegie brand.
Illinois brand.
Abutment.
Views under approach spans.
Details of bents.
Guardrail.
Details of Simple Span Through Truss
Oblique view of span from southwest quadrant.
Views of truss web.
Top chord connections.
Bottom chord connections.
End post.
Evidence of removed portal bracing knee on end post.
Diagonal members.
Bottom chord.
Lateral bracing.
Sway bracing.
Details of Anchor and Cantilever Arms
Oblique view of cantilever truss from southwest quadrant.
Views of truss web.
Truss panels.
Top chord connections where the top chord is a built-up beam.
Top chord connections where the top chord is eyebar.
Top chord connections where the top chord changes from built-up beam to eyebar.
Intermediate connections.
Bottom chord connections.
End post.
End post intermediate connection.
End post portal bracing connection.
Details of main post.
Top chord connection at main post.
Top chord connection at main post.
Bracing connections to main post.
Diagonal members next to main post.
Built-up top chord.
Bottom chord.
Diagonal members.
Vertical members.
Portal bracing.
Sway bracing.
Sway bracing connections.
Looking up at lateral bracing.
Lateral bracing connections.
Details of Suspended Span and Link To Cantilever Arm
Views of truss web.
Top chord connection at end of cantilever arm.
Top chord connection at end post and link to cantilever arm.
Hanger for suspended span, bottom chord connection.
Hanger for suspended span.
Lateral bracing for link between cantilever arm and suspended span.
Top chord connections.
Intermediate connections.
Bottom chord connections.
Suspended span portal bracing.
Suspended span sway bracing.
Suspended span end post.
Top chord.
Bottom chord.
Vertical member.
Diagonal members.